• Votes

    36

    Job costing grid is overly complicated. Job Costing needs to be more ...

    The job costing grid should be eliminated. Job costing should be more closely tied to the General Ledger. There should simply be an extra field on each detail line of ...
  • Votes

    35

    An option to track PO's by amount instead of quantity.

    I have found that more often than not in the construction industry, especially at the small to medium level, materials are not viewed as quantities. A supplier will ...
  • Votes

    30

    Job Phase & Subcontract Records

    Subcontracts currently require Job Phase to be entered into the header of the record, forcing a different subcontract record for each phase of a job. It would be better ...
  • Votes

    27

    job budgets

    The 6-1-9 Budget Reports only include the original budget. As a contractor, we need to be able to have these reports include all of the Changes that have occurred since ...
  • Votes

    26

    Budget Report to show Original Budget with Itemized Budget Changes

    Need a comprehensive Job Budget Report by Cost Code with following information on 1 page: 1. Original Budget 2. Itemized Budget Change Amounts with associated record ...
  • Votes

    25

    Cost Code Record Line Limit too Low

    We would like the ability to add more than 5000 rows in 6-Project Management > 5-Cost Codes.
  • Votes

    24

    Change Orders to Update Budget - Prime Change Details automatically ...

    On the 6-4-1 Change Order when approved amounts, cost codes, and cost types are entered on the first tab, the data should automatically carry forward to the 2nd tab ...
  • Votes

    24

    Generate a WIP report with the option to show only current year ...

    I would like the report 6-1-7-21 with the option to only see current year information (a check box with exclude previous years) I have to generate a quarterly WIP report ...
  • Votes

    23

    Multiple Phases On Purchase Orders

    Phases needed to be added to the grid so you can have more than one phase per purchase order.
  • Votes

    23

    Rename reports

    Allow user to rename reports to reflect business terminology
  • Votes

    23

    I would like to be able to generate a contact list of Vendors per job. ...

    I would like to be able to generate a contact list of Vendors per job. This feature doesn't seem possible as I've contacted Sage 2 times and no one can figure it out.
  • Votes

    22

    We Need Change Requests!

    We have used Timberline for years. We switched to Sage 100 with the idea that it was going to be easier to use. We like most the features and the easy layout of the ...
  • Votes

    22

    Change orders

    On the 3-5 screen when clicking the list of change orders, void or refused ones don't show HOWEVER it should still be there because it's still technically attached to the ...
  • Votes

    22

    It would be helpful when numbering projects to be able to enter ...

    When entering a job in (3-5) it would be helpful to be able to use . or - , or even alpha numeric. That way the job could be revised but still use the main part of the ...
  • Votes

    21

    NEW CSI CODES - Update Cost Codes to match Current CSI Codes

    We would like to update our cost codes to conform with the new CSI Cost Codes that were implemented in 2012. If we want to match the cost codes in a spec book when ...
  • Votes

    20

    Change Order, PO, Subcontracts that cover several phases of the job

    expose the phase on the change order grid so 1 change order can apply to more than 1 phase. this would also be desirable for the phase column on POs and Subcontracts
  • Votes

    19

    Job costing allocations for burden and overhead should be shown ...

    I have been in the construction industry cost accounting for 40 years. In 2005 I purchased Master Builder for a new company. At the time of purchase I did not realize ...
  • Votes

    19

    Allow pictures inserted into Correspondence (6-11-8)

    To complete customer communications, we often include pictures, drawings, etc. Please add this capability to include in the body of the correspondence table. Because we ...
  • Votes

    18

    show all status in change order list

    please, please have an option to show ALL change order status in the job change order list! if one is voided or rejected, you cant see it and i end up reusing the number ...
  • Votes

    17

    3-5 Jobs (Client Pop Up)

    We need a pop up when creating a job that depends on the client. Some clients have special requirements, safety training, MSHA vs OSHA hours, etc. It would be awesome if ...