When replacing a Material Item that has a "Mat Routing" and "Version" assigned (i.e., a subassembly), the "Mat Routing" and "Version" are removed during the BOM Global Replace process.
Basically, if I am replacing a subassembly with another subassembly, provide a check box on the BOM Global Replace to allow me to include the "Mat Routing" and "Version" if a standard/active routing exists for the "Replace With" item.
by: Bob D. | over a year ago | 2 - Manufacturing
Comments