1	09/24/2014	IMC 01 - credit ltg changes
2	10/15/2014	IMC 02 - 1st/2nd flr deducts
3 	11/06/2014	IMC 03 - remv exist lgt poles
4	10/30/2014	remove poles constr area
6	05/19/2015	ceiling rcpt  for tread mach
7	05/19/2015	electrical changes
9	05/19/2015	tv/display outlets
10	05/19/2015	i display area
11	05/19/2015	panel location change
12	05/19/2015	add floor boxes
13	05/20/2015	pulled secondary conduit
 
I need to see that 5 and 8 have been void.  I had to redo 7 change orders because I made two #5's..
please, this is important and really necessary .
by: Sherri S. | over a year ago | Project Management

Comments