As a manufacture we need to have at least six decimal places in the hours field to accurately calculate the labor cost for each step. With only two decimal places the system calculates that the step has no cost. This of course is false as there is a cost but the limitation on only having two decimal places prevents the system from calculating the cost. Please add this feature so labor costs can be accurately stated.

Comments

  • If adding decimal places isn't possible. Allow user to define time scale (Hr, Min, Sec) so accurate times can be entered.

  • We have a client who just upgraded from Work Order Version 2020 to Production Managment Version 2024. In Work Order 2020, in Routing Maintenance, decimal places were 4 for Ops/Hrs. Routing Maintenance was replaced with Work Ticket Template Maintenance with field “Hours per Activity which is only 2 decimal places. Client is very unhappy !