On 11-2, dispatch tab, scheduled date is marked required and causes confusion, especially if the status is 6-quote.
It would be better if the scheduled date was not required in 6-quote.
If the status is 7-work order, then it makes more sense to make at least line 1 in the scheduling grid required rather than the scheduled date.
by: Juli C. | over a year ago | Scheduling
Comments
On 11-2, dispatch tab, scheduled date is marked required and causes confusion, especially if the status is 6-quote.
It would be better if the scheduled date was not required in 6-quote.