I have a client that opted to use warehouses instead of purchasing Multi/Bin. They have created several Warehouses for different areas within one physical warehouse. When they create a BOM the parent item has its own warehouse for the finished good and each of the components may have their own warehouse, which is actually a location in that warehouse.

Each of those components has been set to the correct default warehouse, however when they are entering the Production entry whatever is specified on the Header tab is the default. (Not using WO).

Would like an option to have each componet instead default to the component item records default warehouse.

Comments

  • You can do this with Advanced Scripting in 4.40.

  • What we would like to see is to be able to set the default warehouse for each component in the BOM master file and have that be maintained in production entry. We would still like to be able to change it if we want to in production entry, but the defaults should stay with whatever is in the BOM parent item or revision.