Currently, Fixed and Variable Overhead are included in the total Labor, Material or Direct Cost. Detail is available on the Work Ticket Transaction Detail Report.
by: Karen M. | over a year ago | Manufacturing
by: Karen M. | over a year ago | Manufacturing
Currently, Fixed and Variable Overhead are included in the total Labor, Material or Direct Cost. Detail is available on the Work Ticket Transaction Detail Report.
by: Karen M. | over a year ago | Manufacturing
Comments
By not separating the overhead costs from labor, material and direct costs makes the analysis of costs very difficult, The labor and material costs are overstated and one cannot determine what the absorption rate of overhead is over a period of time.
This makes cost analysis very cumbersome. Can we do this like work order did where the costs were separated on the inquiry screen.