• Votes

    6

    Report Scheduling - Committed Costs 6-1-12-21

    "File - Scheduling" is currently shaded out for this report, including 6-1-12-31, 6-1-12-41 This is a fundamental report for monitoring job status. Should be able to ...
  • Votes

    6

    Retention auto input in to subcontracts

    We would like the 3-5 retention field to map to the subcontracts for the same job. This would ensure the retention is input and correct for each job. If not this field, ...
  • Votes

    6

    Bonding Report that'll tell us if we are over or under Budget. Bonding ...

    Bonding Report should be based off of how much we've billed to date instead of the budget amount. I don't need to know if we are over or under-billed. I need to know if ...
  • Votes

    6

    Change order sequential numbering with Revisions

    Change orders should have some sort of auto revision#. Problem now is that although we can edit the number to include for instance R#1. the sequential order number stops ...
  • Votes

    6

    Export Change Order 6-4-1 from 9-5 Takeoff correctly maintain the ...

    After creating an estimate from 9-5 and then export to a Change Order on 6-4-1 the description gets changed from the original description in 9-5 to the Cost Type. in ...
  • Votes

    6

    6-7-1 Subcontract. Add "Quantity" column to grid

    6-7-1 Subcontract. Add "Quantity" column to grid
  • Votes

    6

    Job Cost Status - Mass Update

    I would like to be able to change the status on multiple job cost records at one time (example, from 1-Open to 3-Billed). This would be similar to what we do in parts ...
  • Votes

    6

    Taxable/nontaxable line items in a change order to be brought into ...

    Allow 1 change order to contain taxable and nontaxable lines to be brought into a progress bill. i.e. change order contains $500 of taxable sales, $100 of nontaxable, ...
  • Votes

    6

    Access the Takeoff screen through the Job Screen module.

    I would like to suggest making a hot button key to link the job screen to the takeoff screen. I know that you can access the job screen through the takeoff screen, but ...
  • Votes

    6

    6-4-1 Change Order it would be great if we could print the "budget and ...

    making this an optional report to print would be great so that we can attached as a second page to the Change Order, to see break-down of Vendors/Sub-contracts and ...
  • Votes

    6

    6-7-1 Subcontract Percentage Complete Information Needed

    Please add a column in the grid to show line item billing percent complete, and a box in the footer area of the screen that shows total percent complete. Subcontractor ...
  • Votes

    6

    Include the subcontractor's contract status in the Subcontract ...

    With this option, a user can notice if there are any issues relating to necessary paperwork before paying any invoices
  • Votes

    6

    6-11-9 Project Hotlist - Add Vendor Name

    Please add the vendor name to the window. You have to manually go into each line to find out the vendor associated with the item.
  • Votes

    6

    Job Phase for Land Developers

    Please relocated the phase field down into the grid area for Subcontracts, change orders, and POs. We track costs by lot/phase, but cannot issue separate subcontracts and ...
  • Votes

    6

    Job Numbering

    It would be very very very useful if there was a notification when a job entry number is more than the next one available. As I have the next Job # 271 but there are ...
  • Votes

    6

    Add job status column to 3-6 Job List report

    Would be great to have a clients job list sorted by job status so we a client's jobs by bid, current, complete, closed status.
  • Votes

    6

    please please make it so we can see any deleted or void change orders ...

    1 09/24/2014 IMC 01 - credit ltg changes 2 10/15/2014 IMC 02 - 1st/2nd flr deducts 3 11/06/2014 IMC 03 - remv exist lgt poles 4 10/30/2014 remove poles constr area 6 ...
  • Votes

    6

    Cost Code Master List

    We used to use Maxwell and while Sage is better in many ways, I think Maxwell did many things better for Job Cost. There was a "master" cost code list that was used to ...
  • Votes

    6

    Vendor list per project

    We just switched to Sage. We would like to produce a report for our field staff that lists each vendor (who we have entered in a PO or subcontract) PER PROJECT, with ...
  • Votes

    6

    In 6-1-8 Allow Bonding Report to be run by Period “between”.

    Our bonding company wants a list of all jobs completed since the last bonding report we sent them. I need to run the report by Period “between”, which is not an option. ...