• Votes

    6

    Microsoft Surface and windows 8.1 fonts are not clear during entry

    Recently purchased Microsoft Surface with Windows 8.1. Entry screens are not clear even with external monitor. Support person told me that it was not tested with the ...
  • Votes

    9

    increase size of Meeting Minutes Description field

    Iincrease size of Description field to unlimitede
  • Votes

    3

    SAGE SQL Replicator Log (SLG) files location control

    Currently the log files for the SQL Replicator is being stored on the C drive under the Public folder, would like to be able to do 2 things. 1) limit the size 2) change ...
  • Votes

    3

    Spreadsheet reports - reports option screen needs to be larger

    The layout screen should be able to be re sized to a larger window view to be able to see more information in the layout screen.
  • Votes

    4

    Format of AIA bill (G703) needs to be better

    The font on the G703 grid is extremely small and hence hard to read. If a larger font cannot be used, perhaps grid lines between entries could be used to help read. As it ...
  • Votes

    94

    Fix issues with screen! Not and idea, a bug that NEEDS FIXING!

    You REALLY REALLY need to fix the fonts size/screen formatting issues in 14.1! Looking at the KB, these problems have apparently been around since 12.x or something (we ...
  • Votes

    20

    In Project Management, when using Spell check, highlight the ...

    When using Spell Check, it would be wonderful if the misspelled words were highlighted so we could visually see where the misspelled word was located.
  • Votes

    13

    Timberline needs to work with higher resolution screens. It is ...

    Timberline needs to work with higher resolution screens. It is horrible on our nice new 24in 4K screens
  • Votes

    25

    PJ commitment scope to be larger

    The commitment scope in PJ, when creating a PO, only allows for 1,000 characters. Some of our PO's require a lot of detail and this makes it impossible and we end up ...
  • Votes

    46

    Increase the number of characters in the invoice number field in ...

    We have multiple vendors whose invoice numbers get cut off because the field does not allow enough characters. Please increase this limit. Thank you!
  • Votes

    41

    In job cost, the cost code description is too short at only 30 ...

    We would like to have more characters for the cost code description in Job Cost. We feel this field is very limiting.
  • Votes

    1

    Void Payments in AP should send reversing entry to CM instead of ...

    If you void a check in a previous period, bank rec appears out of balance with GL because the voided check is now zero in CM. It's a report problem (not really a report ...
  • Votes

    28

    Export to Excel file readable

    Please update the software so that saving a file as an Excel file produces a functional and readable file. Now it is all out of alignemnt and thus not useable without ...
  • Votes

    1

    Sage Paperless Construction Rejected Invoices

    Provide a method to tag Sage Paperless Construction invoices that are in Rejected status other than having to check the invoice manager. How about a notification similar ...
  • Votes

    2

    Equipment needs a report that shows the date sold

    There is no condition available to filter the date sold in the equipment module
  • Votes

    19

    Administrator should be able to see who's in each module, so they know ...

    Administrator should be able to see who's in each module, so they know who to ask to close down if necessary
  • Votes

    1

    Quick checks should flag if printing a check that is set as an ...

    If the invoice is set as an electronic payment and you select to print it as a quick check, it does not say anything about it being originally set up as an electronic ...
  • Votes

    3

    Sage Paperless-On Hold & Rejected Invoices

    There should be a better and more clear "in your face" way to see invoices that are either on hold or rejected than having to check the invoice manager. How about a ...
  • Votes

    1

    In Change Work In Progress, when entering a new WIP record, please ...

    In version 18.2 , I need to select the Contract Item from the the drop down list. Previously, we could could just type in the Contract Item. Please allow this again.
  • Votes

    5

    Would love for Sage to lock down ALL modules, not just GL.

    Would love for Sage to lock down ALL modules, not just GL. Allowing entries to post in CM, AR, AP in a closed period, but not to the closed GL causes out of balance ...