• Votes

    3

    Just updated to version 17.1. Way slower than before. Try to cut ...

    Version 17.1 is much slower than Version 16.1. Regardless of reason, fix it.
  • Votes

    6

    sort cost codes alphabetically

    When you hit the F4 key in the cost code field, the list is sorted in numerical order. Would like the ability to sort in alphabetical order by cost code name.
  • Votes

    2

    Only show current period transactions in bank reconciliation

    When you do a bank recon, you can see all transactions that are posted to GL, even though they are in a future period. There should be an option to only see transactions ...
  • Votes

    1

    vendor limits

    Contractors have licensing restrictions based on their class. For example, in Virginia a Class C has a total value limit for a single contract of $10,000 and total value ...
  • Votes

    2

    Void lien waivers automatically when payments are voided

    One should have the option of voiding a lien waiver at the same time they are voiding a payment. Having to void the payment, then go into subcontractor compliance ...
  • Votes

    5

    accounts payable contacts

    Contacts set up in AP or AR should flow to Address book.
  • Votes

    1

    I was given a report in 2001 CM Cash Book Per Bank it is a GREAT ...

    in design notes: "The purpose of this report is to show each cash transaction and associated details, as well as a running cash balance." In spreadsheet format.
  • Votes

    3

    Add the ability to select a secondary vendor when entering an AP ...

    Add the ability to select a secondary vendor when entering an AP invoice without having to issue a joint check
  • Votes

    1

    In AP Settings, under Accounting Date Usage, when you choose Invoice ...

    In AP Settings, under Accounting Date Usage, when you choose Invoice Date or Date Received, the Accounting Date column goes away altogether when entering invoices. There ...
  • Votes

    1

    Can we get a formula for California SDI that allows for the correct ...

    1. My accountant noticed that my PR tax rate for California SDI was incorrect for elective deferrals to 401k type plans. These elective deferrals aren't taxable for Fed ...
  • Votes

    1

    It would be helpful to allow simple math in the Quantity and unit ...

    other construction estimating products offer the opportunity to do some simple math in these cells and the text is saved in an item history, but even with out that it ...
  • Votes

    1

    In Contract Based Billing, the Preview and Print Draft options are ...

    The first invoice that I preview or print a draft of, takes way too long to preview or print. Please speed up this porcess.
  • Votes

    2

    make it possible to correct subcontract COs, and CN COs

    It makes such a mess when you have to do reversing entry to correct. Architects get completely confused when they review bills. Make it a two step process (like turning ...
  • Votes

    1

    Please add an option to Fill up - not just fill down

    occasionally the item you have at the bottom of a list is the one you want to drag and apply thru adjacent items - it would save a couple of extra clicks - seems like a ...
  • Votes

    1

    Stop the Database editor from jumping to another cell - Sage ...

    Several times in my effort to build my database I will click in a cell to enter data, type the data, hit enter, the highlight moves as if the data was entered, but ...
  • Votes

    1

    work comp lookup on "enter time"

    Every field except "WC Code" has a lookup in the field. Please add!
  • Votes

    2

    The ability to change a GL account without having to make an entry

    The ability to change a GL account without having to make an entry would be far more efficient and not cause all the on and off line items in the GL.
  • Votes

    1

    Customize Job set-up with optional dropdown menu for jobs with more ...

    It would be useful to have the option to track jobs within a job. For example, let's say job # 30-0001 is set up in the system. This job has 3 different ...
  • Votes

    5

    Write Total Contract Value into Job Master from Office Connector

    Would like to frequently update the contract values for multiple jobs from a list generated in Office Connector through the Write function. Only want to update contract ...
  • Votes

    2

    A report for active employees with 0 hours processed for a pay period.

    A report that would show active employees with 0 hours processed when time sheets are entered would be helpful.