Often we have projects that span multiple states (railroad installation). In order to prooperly report for payroll, we have to setup a separate job for each state. This requires us to modify job cost reports to summarize these jobs in order to see the whole picture. We estimate them as one job, not separate jobs.
If we could put a work state on the extra, this would allow PR to pull the proper state code and we can have our job cost reports summarize properly.
Another option is to allow a workstate on the Cost Code (would override the job if filled in).
by: Adam L. | over a year ago | 6 Payroll
Comments