There needs to be a better way to forecast and look at WIP into the future. Currently it can't be broken down within the system between cost codes and time frames. There are instances where it needs to be balanced by different time frames for different cost codes as some parts of the job may come to and end sooner than others. There currently is 3rd party software that does this to an extent but at that point, there is the data maintenance within the 2 different systems which becomes a pain point.