When a user setup a BOM, he/she must be able to direct the system by selecting a location per component line where these items must be picked from.
Then when doing the assembly you can specify to which location the completed item must go.
This is a very logical thing, why has it not been put in place?
by: Derick P. | over a year ago | Operations Management
Comments