When IC is set to use Std Costing, it would be great if when standard costs are changed that there was a process available that created an adjustment batch with cost increase/decrease to standard cost - a process that can be run and create an adjustment batch sitting there waiting to be posted.

Comments

  • This would be a great addition as using standard rather than average costing gives great accuracy of data and margins, and having to manually check stock values and adjust them manually takes time

  • This would save a great deal of time in constantly ensuring that both actual and standard costs are in alignment.