When IC is set to use Std Costing, it would be great if when standard costs are changed that there was a process available that created an adjustment batch with cost increase/decrease to standard cost - a process that can be run and create an adjustment batch sitting there waiting to be posted.
by: Eva P. | over a year ago | Operations Management
Comments
This would be a great addition as using standard rather than average costing gives great accuracy of data and margins, and having to manually check stock values and adjust them manually takes time
This would save a great deal of time in constantly ensuring that both actual and standard costs are in alignment.