It would be VERY beneficial to be able to use the standard contract type (rather than basic) without having to assign resources (both material or labor) to the contract first.

We often don't know what resources will be used and being able to add as needed (without assigning first) so all the tracking of materials and labor is there would be excellent.

A simple tick box to allow any resource to be added without being previously assigned in the overall setup would let us use this program the way we had planned to when we purchased it.