Currently, you can specify a default equipment rate for each piece of equipment, but only for Standard style projects. For Basic style projects, the default equipment rate used during transaction entry comes from the category unit rate. There should be an option to specify where the default rate equipment should come from (similar to PJC Options/Transactions/Timecard Defaults, but for equipment).
This would facilitate the use of a generic "equipment" category on a job, with multiple equipment being posted against it, each defaulting their own rate during transaction entry.
by: Dean M. | over a year ago | Other
Comments
Posted April 2022
Dates on this forum, anyone? You can vote for it on my suggestion from 2014 :
Show DATES on ideas and comments in this forum
https://www5.v1ideas.com/TheSageGroupplc/Sage300ERP/Idea/Detail/15056