It would be great to be able to link labor productivity. As an example, I have many different thicknesses of insulation, installed in different locations and have both labor and material in these items. It would be nice to be able to link the labor productivity of installing 2" rigid insulation on foundation walls to installing 3" rigid insulation on foundation walls. I understand that I could separate labor and material and use the same labor item for all but it is more streamline in some scenarios to have labor and material together.

Comments