    Updates to Management Console Users - Export, User Field

    Can we have an export of the Users from Security setting in Management Console? Also, I would like to have a field I can assign (supervisor), as a user field. ...
  • Votes

    1

    Export to Excel with specific settings

    This is best explained by the Sage Estimating General Discussion post here: ...
  • Votes

    1

    Add to Report Font/Layout a background color for Report Elements ...

    Currently, we can change only the font color, size, type for reports. Reports can be made more readable with background colors for headers/footers (rows). (Not the ...
  • Votes

    1

    Add an ability to generate a Totals Page reference amount from which ...

    To add some addon and markup functionality, it would be great to have an addon type create a reference amount that does not add to the running total nor does it ...
  • Votes

    1

    Update Report Font Colors and Allow Overline Totals

    The spreadsheet and report font colors are 40-year-old 8-bit scheme - can they be updated to more 2020s font colors? Also, it would be great to have a 2pt white space ...
  • Votes

    1

    Ability to create PO's in Sage ERP's from Sage Estimating

    Expand the integration to the ERP's by making it possible to create PO's and subcontracts using Sage Estimating items, and have that exported to any of the three ERP's ( ...
  • Votes

    1

    Ability to create PO's in Sage Erp's from Sage Estimating

    Expand the integration to the ERP's by making it possible to create PO's and subcontracts using Sage Estimating items, and have that exported to any of the three ERP's ( ...
  • Votes

    1

    Move help note box location

    Could you put the help notes for variables when in an assembly on the right side where it's out of the way? right now it hovers over/covers up each question in the ...
  • Votes

    1

    Intacct Integration

    Need the ability, when importing an estimate to Sage Intacct Construction, to be able to break the estimate down into sub-projects, similar to phases inside of sage 100 ...
  • Planned

    2

    Job Size Field - Allow Decimals

    On the estimate information page, we need to be able to add decimal values in the Job Size field. We are a Transmission Service Provider that tracks TL projects by line ...
  • Votes

    1

    Sequence by 'Group Assembly'

    Would be great to get the option to sequence our spreadsheet by 'Group Assembly'. A group assembly is linked to every item so i dont see why we couldn't sequence by that. ...
  • Votes

    1

    Add 'Prefill' for Default WBS Values

    When working on the spreadsheet, where the sequence shows multiple WBS columns, and when an existing item row is selected, add a 'Prefill' button to the Default Values ...
  • Planned

    3

    Flip productivity units on spreadsheet hr/unit --> unit/hr

    Right now the only way to "flip" productivity units on the spreadsheet is to open the items details window on the line item, then right click over the "/" slash where ...
  • Planned

    1

    Send over addons to Bid Matrix

    Tried the sky bridge in Bid Matrix and the round trip works great bringing back in a project from Bid Matrix as a new Sage estimate. What doesn't work at all, however, ...
  • Votes

    1

    Enhance Alternates Summary Screen experience

    It would be cool if that Alternates Summary page look and feel could replace the traditional totals page. And just like reporting...be able to choose certain WBS sorts ...
  • Votes

    1

    Multi-Tiered Assembly Grouping

    It would be nice if we could create multi-tiered grouping for assemblies. Right now we can only have a main group and assemblies within this group. I find organizing my ...
  • Votes

    2

    Import one time items

    I would be a HUGE time saver if we could import (Excel) multiple one time items to a phase.
  • Votes

    1

    Ability to Link Labor Productivity

    It would be great to be able to link labor productivity. As an example, I have many different thicknesses of insulation, installed in different locations and have both ...
  • Votes

    4

    We continue to be looking for Estimating to allow multiuser access.

    I understand that Timberline had a bad experience in the past with multiuser access but it is time to restore this. we typically have 3 -4 estimators working on a project ...
  • Votes

    1

    Correct the Variance report export to excel. subtotal lines are ...

    when exporting variance reports to excel the subtotal lines are misaligned. The PDF version is fine.