-
Votes
5
Item Audit Report To Record System induced changes
Item Audit Report does not record changes to unit cost if that cost is updated by using "Cost Roll-Up Register" for example. When tracking down price/cost changes it ...by: Bryan L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
2
Bill of Material Change Control
Expand the Bill of Material Change Control module to allow adding an item to BOMs selected via search filter criteria. An example would be adding a QR code label to ...by: Kevin D. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
4
Bring Back Material Substitutions to Production Management
Please bring back work order (now ticket) material substitutions that were in work order to production management. This is a significant feature gap between WO and PM. ...by: Brad B. | over a year ago | Last activity about a year ago | Status changed over a year ago | Manufacturing
-
Votes
2
limit users who can transfer out of a specific warehouse
need to be able to limit users who can transfer out of the hold warehouse all users who have access to inventory management should be able to add to the warehouse but ...by: Reta K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Need more accurate Costed BOM Report
Currently the Costed BOM Report will drill down to all levels to use the raw component costs to add everything up. However, we have BOM assemblies that are purchased, so ...by: Meridith K. | over a year ago | Last activity about a year ago | Status changed over a year ago | Manufacturing
-
Votes
1
Allow Dynamic Material in Production Management by user role
This is a great idea but it should be limited as a security event or user/roleby: Rosalie W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Production Management Work Ticket Totals tab should display Fixed and ...
Currently, Fixed and Variable Overhead are included in the total Labor, Material or Direct Cost. Detail is available on the Work Ticket Transaction Detail Report.by: Karen M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
4
Add ability to copy Miscellaneous Charges from Bill of Materials to ...
Currently, when Copy From Bill of Materials is selected when creating a Work Ticket in Work Ticket Entry, the Miscellaneous Charges are removed. This is functioning the ...by: Karen M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
3
Cost Register Roll-Up option to exclude purchased parts.
When running the Cost Register Roll-up, purchased parts that have BOMs are automatically included in the update. This forces you to remove BOMs from purchased parts even ...by: Bryan L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
4
Change Serial Number Format
How about an option to change how the Production Entry serial number format is laid out. If I want to have a serial # with Letters designating the facility where ...by: Ryan W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
13
Recalculate Item History by ITEM
Add additional logic to the Recalculate Item History to be able to choose an item to recalculate, rather than doing it all.by: Mary M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
3
Enable sort functionality in Production Management Work Ticket ...
Users need to be able to sort the lines in work ticket transaction entry. For example, work tickets can be elected to print by item number rather than order entry. When ...by: Barbara K. | over a year ago | Last activity over a year ago | Status changed 11 months ago | Manufacturing
-
Votes
5
Allow steps in Phantom bills
WO (and now Production Management v2022) does not allow Step Numbers to be entered in Bill of Materials when the bill is a phantom. If you add a standard bill as a ...by: Robert W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
10
Increase field size of "Product Line Code" in Product Line Maintenance
Please increase the size allowed for the "product line code" in product line maintenance. 4 characters is way too small. I think it should be a minimum of 10 ...by: Kevin T. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
2
Add Batch Processing to Direct Time Entry
Add Batch Processing to Direct time entry.by: Tracy B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
3
Ability to create UDF to lot or serial number in production completion ...
With the Sage Production make to stock being the business framework replacement for work order we should be able to create a UDF to the lot or serial numbers during the ...by: Avron K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
4
Production management - when closing a work ticket, the inquiry screen ...
When a closing of work tickets are performed the following do not happen: 1) the closing register only shows the work ticket being closed with the parent item. The dollar ...by: Avron K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
4
Production management - when closing a work ticket, the inquiry screen ...
When a closing of work tickets are performed the following do not happen: 1) the closing register only shows the work ticket being closed with the parent item. The dollar ...by: Avron K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
7
inventory cost
We are a manufacturer and use Standard Costing for processing transactions. However, it would be very useful if could at the same time maintain cost tiers for FIFO, or ...by: Barry P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
8
Bill of Materials Change Control
We attempted to implement Engineering Change Control in the Bill of Materials program. We would like to better document and control changes made to existing Bills of ...by: Barry P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing

