• Votes

    6

    Allow a standard scrap % to be set on an item.

    Allow a standard scrap % to be set on an item so that is is not overlooked in BOM. Like many, we cut extrusions to make products. We have a good idea of a standard ...
  • Votes

    9

    delete bill of materials utility

    A utility should be added to Bill of Material that will allow one to delete a bill of material or a range of bill of materials. Currently this is not possible and clients ...
  • Votes

    15

    Need a function to replace BOM components on a range of BOMs

    Add the ability in the 'Relace and Delete Component Entry' to select item by a range of BOMs. This would help when there is a multiple to one ratio of components instead ...
  • Votes

    15

    Store a different standard cost by warehouse

    Many manufacturers have different production costs for an item based on the plant location where the production is done. Component costs may differ widely for different ...
  • Votes

    9

    extended item descriptions in BOM

    the option to have the extended item description in the BOM
  • Votes

    6

    W/O cost roll up register should reference a quantity when addressing ...

    If operations on a routing are of the LOT type and standard costing is being used, the W/O cost roll up register assumes a work order quantity of 1. This causes labor ...
  • Votes

    5

    Add totals of all warehouses to inventory inquiry screen, qty on hand, ...

    In I/M inquiry I would like to see what the total qty on hand, PO, SO, etc is for all warehouses. Can we add a totals row to the bottom of the grid?
  • Not Planned

    2

    Reschedule checkbox for work orders

    There is an MRP reschedule field for Purchase Order lines. There should also be a reschedule field for work order material lines. Reschedule (for PO lines) Select this ...
  • Votes

    2

    Ability to enter retention rate or amount in PO Receipt of Invoice

    Add retention rate and retention amount in PO Receipt of Invoice. This eliminates a second step of going into AP Invoice data entry to adjust the invoice in order to get ...
  • Votes

    4

    The ability to go to BOM from Item Maintenance when entering a new ...

    Right now you can go to BOM when in Item Maintenance but only for existing items with kits. It would be great to be able to go to BOM directly from Item Maintenance when ...
  • Not Planned

    5

    WO Zero Quantity Warning

    It would be helpful to display a warning if trying to complete a work order at quantity zero, similar to the one that is shown if you try to complete it for a quantity ...
  • Votes

    4

    explode subassemblies default should come from the BOM item

    The explode subassemblies option should be controlled at the BOM level. Some make items always explode subassemblies while other make items DO NOT explode subassemblies - ...
  • Not Planned

    2

    Open a string of WO numbers

    I open all the fabrication work order's [WO] at my company. Some of these Assemblies we build contain over 100 items. I would like to be able to reserve a string of ...
  • Votes

    2

    IM setup option: When a LOT, FIFO or LIFO Tier goes to zero, ...

    We have to run the "remove zero qty costing tiers" utility daily to unclutter the lookups. Production entry, shipping, transfers are easier to use if there are not a ...
  • Votes

    7

    Un-receive inventory items when using FIFO

    In the purchase order, when having to un-receive items, it would be nice if we are able to choose which tier we want to un-receive. We are using FIFO, and it is creating ...
  • Votes

    2

    count card entry does not allow entry if BOM is inactive

    Message is this "You cannot use phantom or engineering or inactive bill types". Why would that be the case. We make a bill inactive so that no one accidentally grabs the ...
  • Votes

    15

    Quality Control and Receipt of Goods Action Program

    Add a module or program to the Purchasing module and Bill of Material module to allow for actions to be taken and details to be given related to quality issues during ...
  • Votes

    17

    Do not require all modules be closed when freezing inventory items.

    Aovid the error message "IM2 Is in use by another task" when printing physcal worksheets and freezing items in Physical Count under Inventory Management.
  • Not Planned

    6

    Change DivisionNo back to string in SY0DCT for MRP forecast import

    In MAS90/200 v4.4, the DivisionNo is now a ZEROFILLED field, whereas it used to be a string. When attempting to import, MAS90 auto creates Div 00 even if the entity does ...
  • Not Planned

    4

    WO Entry screen should allow the Due date to be auto-filled by a ...

    WO entry screen due date gets auto-filled by the Promise date on the SO line item on make-for SO workorders. MAS should allow for that date field to be auto-filled by ...