- 
Votes
4
explode subassemblies default should come from the BOM item
The explode subassemblies option should be controlled at the BOM level. Some make items always explode subassemblies while other make items DO NOT explode subassemblies - ...by: Steve P. | over a year ago | Last activity 11 months ago | Status changed over a year ago | Manufacturing
 - 
Not Planned
2
Open a string of WO numbers
I open all the fabrication work order's [WO] at my company. Some of these Assemblies we build contain over 100 items. I would like to be able to reserve a string of ...by: Mat L. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
 - 
Votes
2
IM setup option: When a LOT, FIFO or LIFO Tier goes to zero, ...
We have to run the "remove zero qty costing tiers" utility daily to unclutter the lookups. Production entry, shipping, transfers are easier to use if there are not a ...by: Lewis O. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
 - 
Votes
7
Un-receive inventory items when using FIFO
In the purchase order, when having to un-receive items, it would be nice if we are able to choose which tier we want to un-receive. We are using FIFO, and it is creating ...by: Julie H. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
 - 
Votes
2
count card entry does not allow entry if BOM is inactive
Message is this "You cannot use phantom or engineering or inactive bill types". Why would that be the case. We make a bill inactive so that no one accidentally grabs the ...by: Lewis O. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
 - 
Votes
19
Add ability to enter/edit BOM revision number during SO entry
Add ability to enter/edit BOM revision number during SO entryby: Larry E. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
 - 
Votes
29
Add ability to edit bill options on SO lines.
Add ability to edit bill options on SO lines.by: Larry E. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
 - 
Votes
11
Ability to more easily scan or enter the completion of INDIVIDUAL ...
Ability to more easily scan or enter the completion of INDIVIDUAL serialized items, rather than having system assign range of serial numbers.by: Larry E. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
 - 
Not Planned
5
Add ability to retain print ranges when clicking the 'Select' Button ...
Add ability to retain print ranges when clicking the 'Select' Button in Work Order Traveler Printing.by: Larry E. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
 - 
Not Planned
18
Allow printing detailed MRP report by vendor then by item number.
The current MRP report only allows printing by item number. The MRP action by vendor report does not provide the detail necessary to make actual decisions about item ...by: Dain C. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
 - 
Votes
13
Improve "Integer Units of Measure" Feature in BOM
Provide rounding options (Always Up, Always Down, or Closest Integer) instead of always going to closest integer. The manufacturing process can sometimes utilize items ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
 - 
Not Planned
47
Add "Costed Work Order" Report
Provide a report, similar to the Costed Bill of Materials Report in the BM module, that would provide an audit listing of all cost inputs for a manufactured item, ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
 - 
Not Planned
15
MRP
Change the MRP module so that when you follow it's recommendation to make purchases to replenish stock (not SO or WO demand, but IM reorder point demand) it will not ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
 - 
Not Planned
11
In WO module, add employee production efficiency reports
In WO module, add employee production efficiency reportsby: Larry E. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
 - 
Not Planned
35
In WO module, add scrap report
In WO module, add scrap reportby: Larry E. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
 - 
Not Planned
24
Allow drilldown into MRP inquiry for any component when starting from ...
Allow drilldown into MRP inquiry for any component when starting from top-level assemblyby: Larry E. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
 - 
Not Planned
13
In MRP, show standard and purchase UOM on action by vendor report
In MRP, show standard and purchase UOM on action by vendor reportby: Larry E. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
 - 
Not Planned
14
In MRP, give user ability to sort action by vendor report by top-level ...
In MRP, give user ability to sort action by vendor report by top-level assembly, so that report shows all components needed for that assembly and all its subassembliesby: Larry E. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
 - 
Not Planned
11
Add better accounting for machine and machine hours
Add better accounting for machine and machine hours (instead of labor hours) to routers and WO transaction entryby: Larry E. | over a year ago | Last activity over a year ago | Status changed 6 months ago | Manufacturing
 - 
Votes
26
Allow Items on a Bill to have a fixed quantity per bill rather than ...
Currently there is no way to have a single unit per Work Order. There is a kludge to issue some small portion of that and then have the systems scale the partial units ...by: Juan V. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
 

