-
Votes
10
Add the ability to select which subassemblies to explode in Bill of ...
Instead of forcing all subassemblies to explode on the lines tab, allow the user to choose which subassemblies should be exploded. Some production environments need to ...by: John W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
10
Add inspection Required flag in IM
Add inspection required flag in IM. Requires receiving or in-process inspection accept quantity be entered before processing PO or WO or Production Entry receipts can ...by: Frank L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
10
limited access to do maintenance in acct receivable and inventory
It would great if our Customer Service Dept had limited access to Customer Maintenance to add new contacts with phone numbers, address and email without having to go to a ...by: Bill B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
10
option for work order scrap completions to not reduce qty to complete
Currently processing a scrap transaction reduces the qty to make on the work order. If we plan to make 10 units and complete 8 good units and complete 2 scrap units, the ...by: Steve P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
9
WO- Complete to WO option should automatically issue the material to ...
In WO transaction entry, the user is given the option to complete to either scrap, Inventory, SO or WO. Regardless of the choice, the completed parts post to inventory. ...by: Geri R. | over a year ago | Last activity 8 months ago | Status changed over a year ago | Manufacturing
-
Not Planned
9
Work Order Releases relating to Sales Orders and Customers on hold
We would like to control the release of work orders being made for a sales order when the order or customer is on hold. Currently there is no warning if you release a ...by: Steve P. | over a year ago | Last activity about a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
9
Allow a replication function for work order entry.
I have a client who on a daily basis will need to enter 40 or 50 virtually identical work orders with the only difference being scheduling. And sometimes even the ...by: Thomas R. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
9
extended item descriptions in BOM
the option to have the extended item description in the BOMby: lanette f. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
9
delete bill of materials utility
A utility should be added to Bill of Material that will allow one to delete a bill of material or a range of bill of materials. Currently this is not possible and clients ...by: Avron K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
9
MRP Auto Generate Work Orders - accomodate multiple warehouses
After updating the MRP auto generate work order register, the end user needs to go into Work Order Entry and make changes to warehouse information because some make items ...by: Steve P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
9
Ability to add picture(s) to each step on the Work Order Traveler ...
Currently we have several products that "need" to have pictures to assist in the assembly of the product. Unfortunately, instead of just displaying a couple pictures ...by: James S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
9
Standard cost roll up that has labor and overhead included
Unless you have a work order currently open for an item, the cost roll up feature under the Work Order module doesn't work correctly. The Labor/Overhead number is ...by: Ron C. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
9
Make a Quick Order button in Inventory Inquiry
We would like to see a "Quick Order" button in Inventory Inquiry. So that you could click on it and it would open a New Purchase Order for the items Primary Vendor and ...by: Paul M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
9
scrap reporting
In Workorder there is nothing that would allow a user to report scrap for certain items in a Bill of Material item. If only a portion of the item (ie. subcomponents) were ...by: Andrew M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
8
Intra Facility Transfer Order
Need the capability to be able to release Transfer order with lead time to move material from one warehouse location to another. As we know, warehouse locations can be ...by: Kevin D. | over a year ago | Last activity 10 days ago | Status changed over a year ago | Manufacturing
-
Votes
8
Include Kit Items on the Bill of Materials Cost Roll Up Register
Some end users have stocked sales kits. This should be possible (DSD had an enhancement for this = BM-1019).by: Steve P. | 10 months ago | Last activity 8 months ago | Status changed 10 months ago | Manufacturing
-
Votes
8
ReOrder Rule Maintinance "Rule" of Time with increments of Case for ...
Update the Reorder Rules to allow it to plan in time rounded by case. Add a new rule to all the RO policy to look the demand need is a set time from the IRP to determine ...by: Kevin D. | over a year ago | Last activity 11 months ago | Status changed over a year ago | Manufacturing
-
Votes
8
closed/completed work ticket re-opening option
sometimes a work ticket is closed inadvertently for a variety of reasons. It would be very helpful to be able to re-open a fully completed work ticket in production ...by: Justin S. | over a year ago | Last activity about a year ago | Status changed over a year ago | Manufacturing
-
Votes
8
Bill of Materials Data Entry, #2 Lines Tab. Add feature which warns ...
Bill of Materials Data Entry, #2 Lines Tab. Add feature which warns you when the Quantity entered is zero or if the line item already exists on another line on the bill. ...by: Kenneth P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
8
Bill of Materials Change Control
We attempted to implement Engineering Change Control in the Bill of Materials program. We would like to better document and control changes made to existing Bills of ...by: Barry P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing

