After entering the cost information on the 4-2 Payable Invoice screen, a separate screen appears for posting to cost codes, and the pull down window lists ALL cost codes in the system.

PLEASE INCORPORATE THE JOB COST SCREEN IN THE SAME 4-2 GRID TO ELIMINATE HAVING TO REENTER ALL OF THE INFORMATION (If using several cost costs, this means reentering several lines of information, and possibly making an error.)

Currently it's too easy to mis-code costs, then reports don't make sense. In order to enter correctly, you now have to switch back and forth between budget screen and each individual subcontract screen.

-The cost codes selection should be limited to the code in the job budget and not allow posting to codes that are not in the budget.
-When a subcontract is selected int he "Subcontract" window, the cost code selection should be limited to the codes on that subcontract only, and not allow posting to cost codes outside of the subcontract.

Comments