Currently the Costed BOM Report will drill down to all levels to use the raw component costs to add everything up. However, we have BOM assemblies that are purchased, so we don't want the component costs, we want the assembly Average Cost to be used in the Costed BOM Report. If the Number of Levels is set to 1, the report should only look at the Average Cost of the components on that single level and not drill down deeper.
Also, labor is missing. Because labor is added through routings in the Work Order Module, the Bills of Material Module cannot be used to get an accurate costed BOM. There should be a costed BOM option in the Work Order Module to include the routing and therefore the labor costs.
by: Meridith K. | over a year ago | Manufacturing
Comments
Also see these tickets for additional requests related to BOM cost roll up.
https://www5.v1ideas.com/TheSageGroupplc/sage100erp/Idea/Detail/41532
https://www5.v1ideas.com/TheSageGroupplc/Sage100ERP/Idea/Detail/12589