• Votes

    2

    Be able to copy vendor parts prices to a new vendor

    When you have a new vendor with the same prices as an exiting vendor it would be great to be able to copy the old vendors prices in the parts database to the new vendor
  • Votes

    2

    6-2 Budget - Set

    The 6-2 Budget should show if the budget is set or not. Maybe a check box just like the lock edit box. Then you could see if the budget was actually set. The problem ...
  • Votes

    4

    On the Jobs 3-5 screen, I would like to have a link to the 9-5 ...

    It would be similar to the links available to go to the AP Invoices, AR Invoices, Proposals
  • Votes

    3

    Move a quote to another client

    We would like to see the ability to move a quote from one client to another. If we could just have the ability to change the client number for the quote, we will be more ...
  • Votes

    12

    View 2 Take-Offs simultaneously

    We should be able to view 2 take-offs at the same time. It creates a lot of wasted time having to go in and out of one to see the other.
  • Votes

    1

    Show the Group selected totals in Take Off Grid's like the other Grids ...

    Add group Sum Totals to bottom of Take Off Grids as well. Like the rest of the grids now have
  • Votes

    2

    Allow 9-5 Estimating Screen to specify a Margin per line item

    Allow 9-5 Estimating Screen to specify a Margin per line item (which would auto-calculate the Profit Rate/Markup on that line). You could choose item by item whether to ...
  • Votes

    6

    Easier Material Price Updates

    Begin using an outside service with the ability to import product and pricing information to update and maintain accuracy in our material database & estimating system; ...
  • Votes

    1

    Labor Hours Associated to Material Units.

    There are many other estimating programs that offer labor hours for each item in their database. Begin using standard labor-units (Craft Hours) in your material database.
  • Votes

    3

    I'd like to use decimal formatting for part numbers in the same ...

    The part number would consist of the part class to the left of the decimal and the part # to the right. I envision a max of 5 decimal places to right and 7 to the left.
  • Votes

    3

    Enter a check box on 3-5 screen for whether to allow the previous ...

    I would like to open my takeoff launch in 9-5 and only see takeoffs that I want to see... now I have a very large list and only need access to 4 or 5. It would be great ...
  • Votes

    3

    Increase price limit of a part

    We need to enter parts with a cost and billing amount exceeding $99,999.99 but anything greater than this creates an error of "Invalid numeric entry." This should not be ...
  • Votes

    4

    Overwrite extended prices in bid item details

    Rather than calculating the extended price by applying overhead and mark up %'s, provide the option of overwriting the extended price and allowing the system to back into ...
  • Votes

    3

    User Defined Fields USDF 1 and USDF2 on Assemblies in 9-3

    In 9-3 - unlike every other master table - the two standard USDF 1 and USDF2 user defined fields do not exist. Business need - if an assembly is created for a specific ...
  • Votes

    6

    Alternates in Estimate should NOT be included in Base Bid Amount

    In Sage 100 CONTRACTOR estimating module when a job has an alternate or alternates, the alternate pricing should NOT be included in the Base Bid amount. This makes it ...
  • Votes

    2

    in Takeoffs: Allow the sales tax to calculate using the sales tax ...

    Currently in takeoffs you have to go line by line to determine whether the sales tax district should be listed. It would be helpful if it could be assigned to all cost ...
  • Votes

    4

    Create 'toggle' for Profit Rate for markup/margin

    Our sales people use Margin for everything, and it is a real pain to enter everything in Sage as Markup (even though the bottom of the grid reflects the total Margin, ...
  • Votes

    2

    Keep parts order the same from Bid Request to PO

    When rolling from a Bid Request to a PO, the items are sorted by description if there is no part number and by part number if there is a part number from parts list. ...
  • Votes

    2

    Add Recap button for "Part"

    Be able to summarize multiple bid items and see totals of part across the job. Have it summarize by Sage Part # and give total quantities. Optional "Part by Bid Item" - ...
  • Votes

    3

    IN 9-2 Parts, increase the Parts Price field size two digits to allow ...

    In order to enter a budget that is currently in a spreadsheet, the Parts are entered, but some item prices exceed the current field size limit of 99999.9999. This was ...