• Votes

    3

    In 6-2 Budgets, be able to type directly into the Notes field

    Anyone manually entering budgets would want this. Right now, it pops-up the Notes Entry window, takes a second to update (slowing you down) and flash your screen, you ...
  • Votes

    10

    The ability to assign a different department to each phase of a job

    I think it would be helpful if we could assign departments to a particular phase of a job, instead of only allowing 1 department to be selected in the main job window. ...
  • Votes

    8

    Job Status # 5 , complete, should warn that you are posting payroll to ...

    As above
  • Votes

    7

    Job labor hours Actual/Budget~ with uncomputed payroll - in summary

    We need these to be in summary by cost cost as its too much data for the operations team to see when every payroll record is shown in the detail.
  • Votes

    3

    Transmittal from Work Order

    Please add a feature to 11-2 Work Order screen to tie into the Transmittals. For a Purchase Order, you can go to the 11-2 Work Order screen - Options and create a ...
  • Votes

    17

    Sage offers automated reports, however, with static date specific ...

    Sage offers automated reports, however, with static date specific reports, it is incapable of doing it. We need, at the end of the day, to be able to send automated ...
  • Votes

    13

    Mandatory Fields Based on Job Status

    Project managers are often left responsible to enter job details, but the administrative staff are the ones who need them. It wastes a lot of time when the information ...
  • Votes

    6

    6-4-1 Change Order it would be great if we could print the "budget and ...

    making this an optional report to print would be great so that we can attached as a second page to the Change Order, to see break-down of Vendors/Sub-contracts and ...
  • Votes

    5

    Add Cost Code and Date Range to the 6-1-4-51 Report

    I need to be able to run a report that shows how much has been billed against a specific cost code during a specific date range in the 3-7 Progress Billings.
  • Votes

    4

    Tolerance levels per costcode

    Home builders would need this. Sage 100 in need of a tolerance setting per cost code so that when we have a supplier with six different cost codes, that we can set a ...
  • Votes

    4

    Proposal rounding

    On behalf of Melissa Plunkett: It would be nice if the Unit Price in Proposals would only have 2 spaces after the decimal to prevent rounding in reports.
  • Votes

    6

    Export Change Order 6-4-1 from 9-5 Takeoff correctly maintain the ...

    After creating an estimate from 9-5 and then export to a Change Order on 6-4-1 the description gets changed from the original description in 9-5 to the Cost Type. in ...
  • Votes

    13

    Add a field to vendor reports that allow you to filter by job.

    There is no way in Sage to create a Job list of subcontractors and vendors.
  • Votes

    8

    Allow alpha numeric for phase number.

    We need to be able to enter an alpha numeric phase number. For example: 4E or 4W for 4th floor east wing or 4th floor west wing. Our project managers track our costs by ...
  • Votes

    1

    Customize Change Order Requests

    Different GC's like to have or not have certain things shown on change order requests. One GC does not want the bottom portion of the change order amounts shown on it, ...
  • Votes

    6

    Change Orders 6-4-1 Add Tax District to calculate Sales Tax

    Just like in the Takeoff 9-5 there should be a "Tax District" column to calculate for sales tax as needed.
  • Votes

    3

    Add a California DIR Registration Number field

    Add a California DIR Registration Number field to 4-4. California also has a DIR # for public works contractors. It's as mandatory as a license number.
  • Votes

    8

    Allow PO#'s to be linked to subcontracts

    It would be nice if you were able to create po#'s through the 7-1 Subcontract screen. Much like how you can create po's in the 11-2 Work Order screen to have a po linked ...
  • Votes

    3

    Inspections field on Daily Reports

    It's extremely important to be able to track all inspections. Just has there is a place for Incidents or Meetings on the Daily Report, there needs to be one for ...
  • Votes

    25

    Cost Code Record Line Limit too Low

    We would like the ability to add more than 5000 rows in 6-Project Management > 5-Cost Codes.