• Votes

    16

    Auto-Attach all emails sent from Sage to the job/section

    Automatically attach any email (generated at each print menu) that is sent through Sage to the appropriate attachment section. For example, if I directly email a PO out ...
  • Votes

    28

    job budgets

    The 6-1-9 Budget Reports only include the original budget. As a contractor, we need to be able to have these reports include all of the Changes that have occurred since ...
  • Votes

    1

    job ledger report Payment status

    Sage 50 has a job ledger report that show a payment status. I would like this report added to sage 100 contractor. in job cost
  • Votes

    6

    Cost Code Master List

    We used to use Maxwell and while Sage is better in many ways, I think Maxwell did many things better for Job Cost. There was a "master" cost code list that was used to ...
  • Votes

    43

    Lien Waiver Templates in Word

    We have found that the lien waivers are cumbersome to modify and design in Sage 100. Our old system (Maxwell Management Suite) used Word templates to create lien ...
  • Votes

    10

    Cost to complete (6-8-1-21) does not include phase Cost To Date

    Cost codes with phase are not listed on the Cost to Complete - Cost to Date. Please add all cost codes and amount that encompass the COST TO DATE (this way the Cost To ...
  • Votes

    3

    Please design a Subcontractor Change Order Form.

    Need a form that looks the same as the General Contract Change Order!!
  • Votes

    1

    When entering PO details, can you change the color of current field or ...

    Currently when entering data in Purchased order, it's hard to see what field you're in. Hopefully, there's a way to change the color properties to highlight the current ...
  • Votes

    1

    User Permissions

    We need to be able to "fine tune" user permissions more when entering Purchase Orders. we do not want our employees to be able to edit a P.O. once it has been entered. ...
  • Votes

    10

    Purchase order expired certificated warning

    When creating a purchase order it does not warn when a vendor has an expired certificate. It should warn like it does when you attempt to create a subcontract for a ...
  • Votes

    1

    We need to have the userdef field brought back as being able to change ...

    In version 19 we were able to select "Character" or "Number" as field types. In version 20, we are no longer able to select, therefore, reports created in version 19 no ...
  • Votes

    2

    create a building permit module under document control

    It would be nice to track DOB permits on Sage instead of a separate excel spreadsheet.
  • Votes

    3

    In the Purchase orders you cant copy, delete and paste in the created ...

    This was feature we had before the last update and it creates more work and steps the new way. It takes away from the flow your Po's used to have and leaves room for ...
  • Votes

    13

    Need to have a "County" field in 3-5 Jobs under the general tab.

    My state requires business licence filings by county and I really need the ability to run reports on projects based on location i.e. City of, and County of. Just the ...
  • Votes

    8

    Would like to have the ability to lock the added text within the Note ...

    When adding text to Notes, it would be really nice to automatically add Today's date instead of adding it manually. ALSO, very important for us, is to be able to lock ...
  • Votes

    1

    In 3-5 Job window we have certain groups that we want to see job ...

    In 3-5 Job window we have certain groups that should not see the contract amount and can be limited in that field. Only problem is that when clicking on the Contract ...
  • Votes

    6

    6-7-1 Subcontract. Add "Quantity" column to grid

    6-7-1 Subcontract. Add "Quantity" column to grid
  • Votes

    1

    6-7-1 Subcontract. Redesign 6-7-1-22 report so "Notes" header prints ...

    6-7-1 Subcontract. Redesign 6-7-1-22 report so "Notes" header prints above the printed grid notes.
  • Votes

    5

    submittal numbers "Next bj Job"

    Submittal numbering is critical to be able to number by Job, just like RFI's and Change Orders!
  • Votes

    6

    Report Scheduling - Committed Costs 6-1-12-21

    "File - Scheduling" is currently shaded out for this report, including 6-1-12-31, 6-1-12-41 This is a fundamental report for monitoring job status. Should be able to ...