• Votes

    2

    BUG. CRITICAL. Import requistion format does no allow to import ...

    It seems amazing that the best or suggested workflow in PO which is to use Requisitions as an entry point to the system, does not allow to import Extras! This means that ...
  • Votes

    10

    Massive improvements to Report Designer

    After using Report Designer quite a bit: these changes would help out immensely: - Allow teletype for fields: for instance I know that in a report, I want the AR ...
  • Votes

    3

    Data dictionary needs definitions

    I'm trying to write a report in Crystal - but when I use the data field "totalprcost" I get a different number than if I pulled what I think the components are (direct ...
  • Votes

    3

    In Job Setup, the Type field should be a dropdown box

    In Job Setup, the Type field should be a dropdown box to standardize the information just like the dropdown in the Customer setup in Accounts Receivable. This will ...
  • Votes

    1

    accts payable manual/quick check posting journal

    the job cost recap section of this report is INCREDIBLY misleading. I showed this report to two other accountants in my office and asked them how much got posted to job ...
  • Votes

    11

    reuse check number

    my god, why do you make me jump through hoops to reuse a check number? this is ridiculous. I issued a hand written check so I cant change the number in my system. I ...
  • Votes

    1

    CRITICAL. AR - Customer Cash Receipts Issue When Using Different ...

    There are many ways to look at this: 1. AR does not allow to link a cash receipt to a Contract like a downpayment or upfront which is normal in public works. We have to ...
  • Votes

    1

    AR - Need to be able to establish/setup retentions/deductions that ...

    Generally, all invoices (especially for those who work for Govmt Contracts) have to be deducted for retentions or deductions made by the Govmt Agencies. It would be nice ...
  • Votes

    2

    Project Management field reports Activities Reports

    Issue: Project Management Reports > Field Reports > Work Activities and Progress, the Description field prefills from the Cost Codes entered and overrides what is ...
  • Votes

    1

    Cannot print a complete daily log

    Work Activities and Progress do not print on the daily report. Have to print on a separate report, on which the full description does not print either.
  • Votes

    1

    Description only prints partially on work activities report

    The description entered in daily logs is cut off when printing the work activities report and if a cost code/category is entered, the description is replaced by the cost ...
  • Votes

    2

    AP - Generate Electronic Payments - can you have the text file pull ...

    Since we have multiple entity in one data folder, I need to manually change the company name every time I generate electronic payments
  • Votes

    31

    Here is a thought, how about listen to your customers??? 1. Windows ...

    I have been with this software company for 16 years and if there was any way in which I could get out of it at this stage I would! Basic enhansements that have been ...
  • Votes

    3

    add job description to CO send feature

    Sending a CO - does not include Job description in the email. Only gives the CO#. When the GC replies back to us we have no idea what job it is..... Wehave mutiple jobs ...
  • Votes

    1

    Allow Better Formula Creation UI

    When creating reports in Report Designer - stacking IF statements and other commands can leave you without much visual clue as to where certain statements start and end. ...
  • Votes

    4

    Let us specify secondary vendors on Commitment Insurance certificates

    We need to track insurance certificates for secondary vendors (similar to how we can do it for lien waivers). Please add this compliance feature into the software. We ...
  • Votes

    2

    Requisition- Need ability to utilize "user defined" fields on ...

    If we ordered an item that is out of stock. We can delete the PO but the requistion still shows as ordered. Need a field available to us to in order to state that it ...
  • Votes

    4

    My Assistant

    Need to integrate with purchasing... We need to send letters to our GC's about missing approvals (requisition)- letters to our suppliers about ETA dates (Purchase ...
  • Votes

    2

    PO - don't want to reuse PO numbers that have been voided.

    Please give us ability to NOT re-use PO numbers.
  • Votes

    2

    PO - Ability to create a PO on closed job

    In set up - give us a check box to allow PO on a closed job - often we have to order attic stock or punch list material on a closed job.