-
Votes
13
Add a window for a photo to the employee, parts, and equipment records
It would be very helpful if there was a visible window on the Employee record, Parts record, and Equipment record that you could upload a photo of that specific ...by: Travis F. | over a year ago | Last activity over a year ago | Status changed over a year ago | Inventory
-
Votes
4
Add a STATUS column to the 6-11-9 Project Hot List
It would be nice to have a status column for each record in the project hot list. Right now we have to open each record to see the current status. Please add the ...by: Travis F. | over a year ago | Last activity over a year ago | Status changed over a year ago | Project Management
-
Votes
3
routing button for subcontracts
It would be nice to have a routing button and log in the subcontractor module like the one in the change order module. It's nice to have a log of when things are sent / ...by: Ashlea S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Project Management
-
Votes
9
Entering Employees in 5-2-1
When entering a new employees it should give you a pop up before saving if the employee already exist in the system. I am having problems with entering new employees and ...by: Taisha R. | over a year ago | Last activity over a year ago | Status changed over a year ago | Payroll
-
Votes
10
VOID TRANSACTION DATE
In sage 100 Contractor every VOID transaction must have VOID transaction date as a current date: current year and current period, even if the original transaction was ...by: Andrei R. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
14
Reprint Original Certified PR after rate change
We should be able to reprint a certified payroll report after a rate change and have the original rate calculations show on the CPR instead of the report changing ...by: Kelli B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Payroll
-
Votes
6
AP Invoice Status
The AP invoice status should have the following sequence: 1 - Open: The invoice has been entered by the AP processor, and the invoice can still be edited. 2 - Review: ...by: Larry P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Accounts Payable
-
Votes
3
Add and Alpha Display look up in the 4-4 Vendors
I do not always know my vendor number - an added alpha display look-up would make it easier to find.by: Michelle A. | over a year ago | Last activity about a year ago | Status changed over a year ago | Accounts Payable
-
Votes
1
sadmb log location
The database admin tool should include an link to or identification of the SADMB log. It would be helpful to have a history of the log, but there is no reference in the ...by: Mark H. | over a year ago | Last activity over a year ago | Status changed over a year ago | Utilities
-
Votes
12
When entering a PO, Sage to tell me how much quantity is available in ...
When entering a PO, I want Sage to tell me how much quantity is available in a pop up within the PO. As I create the list of material I need, the PO should know how much ...by: Mark M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Inventory
-
Votes
1
In the Calculations, there should be more expense account options so ...
Need more flexibility in the payroll calculations!!! please!!!by: Mark M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Payroll
-
Votes
1
PO status access should be limited to supervisor if it is still open
PO status access should be limited to supervisor if it is still openby: William S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Project Management
-
Votes
11
job #'s not entered in A/P invoice header but entered on job costs ...
If the job is not entered in the header of an A/P invoice it will not show in the Job - A/P Invoices tab. I have to run a report to catch all costs. It should post to ...by: Lisa T. | over a year ago | Last activity about a year ago | Status changed over a year ago | Accounts Payable
-
Votes
2
Ubiquitous Tree Style Class Selection
Bring the same expandable/collapsible tree structure to any selection window involving part/assembly classes. For example, in the 9-2 parts window, when you try to assign ...by: Ryan B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Estimating
-
Votes
1
Bring a Notes Field to Part Classes/Assembly Classes
Convenient for reporting purposes would be a notes section for Part/Classes/Assembly Classes, so users can explain in further detail about what should be and shouldn't be ...by: Ryan B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Estimating
-
Votes
7
Better Integrate Work Orders into the Rest of the Software
Many companies have a “functional” organizational structure, meaning that one person enters payables, one person creates purchase orders, one person creates receivables, ...by: Ryan B. | over a year ago | Last activity over a year ago | Status changed 11 months ago | Other
-
Votes
3
Fix Part Cost Default “Billing Amount” in 9-5 Takeoffs
In 9-5 Takeoffs, there is an option to choose “billing amount” as the default cost. This doesn’t really make sense. Billing Amount = Cost + Overhead + Profit in most ...by: Ryan B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Estimating
-
Votes
5
Integrate Inventory and Takeoffs
When you do a 9-5 takeoff, you should be able to: - Run an inventory report for the material items in the takeoff, to see if there is stock of that item before ordering ...by: Ryan B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Inventory
-
Votes
2
Attn USERS: Check Out http://www.reddit.com/r/Sage100Contractor
Since this site gets heavy traffic and is primarily about Sage 100 Contractor, there is another great resource now available: The Sage 100 Contractor Subreddit ...by: Ryan B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Utilities
-
Votes
45
Re-Allocate costs of payables/inv. allocs/cc receipts without voiding ...
Often times job costs are allocated incorrectly. Usually to the wrong job. It is pretty time consuming to fix these errors. Since this is such a common occurrence, there ...by: Ryan B. | over a year ago | Last activity 11 months ago | Status changed over a year ago | Project Management

