• Votes

    12

    View 2 Take-Offs simultaneously

    We should be able to view 2 take-offs at the same time. It creates a lot of wasted time having to go in and out of one to see the other.
  • Votes

    7

    Alerts Manager -Send Alerts to multiple Dashboards (7-6)

    Currently Alerts/Reports are limited to only one other employees dashboard, yet multiple emails can be attached. To alleviate email reports every morning, it would be ...
  • Votes

    2

    On 3-5 Screen(Jobs) would be great to see inventory ...

    On 3-5 Screen(Jobs) would be great to see inventory allocations(Tickets)-maybe a tab at the bottom
  • Votes

    2

    T&M invoices need to pull more date from job costs. I just had ...

    T&M invoices need to pull more data from job costs. I just had Accordant redesign to include a description from PR and AP. This should be a report option, easy enough to ...
  • Votes

    3

    Customize Notes in Progress Bill so that it prints correctly

    Currently you cannot modify the size of the notes. We need this ability in order to look professional.
  • Votes

    3

    cash receipts lookup by Client Short Name - used to work - enter the ...

    We can do this on the Job Field but not on the Client field.
  • Votes

    3

    The ability to enter a Bank designated "Originator ID". This is ...

    Instead the user is supposed to Edit the NACHA file, not a good idea.
  • Votes

    9

    Project Dashboard Improvements

    We would like to see a more comprehensive Project Dashboard so we don't have to run separate reports to see a summary of important parts of a single project. For example ...
  • Votes

    3

    6-11-4 link on the 3-5-Job Screen

    There should be a link at the bottom of the 3-5 Job Screen for Submittals. The link should show a list of Submittals including a date, a description and the current ...
  • Votes

    1

    3-5 Jobs (Accounts Receivable) Project Date data is saved as a string ...

    We are attempting to build an alert or report that depends on a date field in the 3-5 screen. The table is Actrec. The screen is 3-5 on the Project Dates & Sales ...
  • Votes

    6

    Additional Minority Types in Vendor Screen

    Please add the following in the drop down menu for Minority Type: Small Business Enterprises (SBEs) Small Disadvantaged Business Enterprises (SDBEs) Disability Owned ...
  • Votes

    2

    ACA query report actual codes

    I set up a new query to print out a report to see what codes were under employees. It comes up with numbers instead of the actual codes. ie. safe harbor code 2E comes ...
  • Votes

    1

    Ability to have character capability on worker comp codes.

    I have a special comp code for Carpentry, 5432U - USLH working near/over water.
  • Votes

    6

    Cost Code Report

    I would like to Print Cost Codes in ALPHABETICAL order OR numberical. At this time there is no way to do that.
  • Votes

    8

    Allow alpha numeric for phase number.

    We need to be able to enter an alpha numeric phase number. For example: 4E or 4W for 4th floor east wing or 4th floor west wing. Our project managers track our costs by ...
  • Votes

    3

    Menu item 6-4-1 (change order editing after save)

    Change orders should be return to being editable after being saved as it was in version 19. The only way to edit in the new version is to copy, delete, paste and then ...
  • Votes

    6

    3-6 Need property owner box added.

    Property owner names differ from client names. Need property owners to be included in lien waivers, as well as customer names.
  • Votes

    6

    Have the company name appear under every tab like a watermark

    When you have multiply companies, you can change the background colour. I would like to add the ability to add the company name as a watermark on each tab. I had issue ...
  • Votes

    6

    Vendor list per project

    We just switched to Sage. We would like to produce a report for our field staff that lists each vendor (who we have entered in a PO or subcontract) PER PROJECT, with ...
  • Votes

    6

    Certified Payroll for full duration of the project and not the current ...

    Projects through state and federal require certified payroll information throughout the entirety of the project. SAGE 100 pulls information only from the current payroll ...