• Votes

    1

    Substitute

    The ability to substitute an item from the spreadsheet view. Anyone editing an estimate. It's time consuming to have to either go back to the assembly to do this, or to ...
  • Votes

    2

    Add Assembly from Assembly List

    The ability to add the assembly from the assembly list without having to open the assembly first. Who? Anyone who wants to save a step. Why? Time saving. How Used? ...
  • Votes

    1

    Send *unassigned* items to JC by themselves

    In order to send a portion of an estimate as a "Base Project" in Job Cost, the WBS code needs to be *unassigned* so it is not included in an Extra. This works great if ...
  • Votes

    5

    Add Productivity Tables as you had in Pervasive Program

    When you create a takeoff and are setting up job you are no longer in SQL Version offered the different Productivity Table List that had 10 different Productivity Levels ...
  • Votes

    7

    Include a Dark Mode for the program

    We (estimators especially) spend 8-12 hours a day in front of our screens with programs that boast eye-blistering light because of the white default themes. in the age of ...
  • Votes

    1

    Create a report that will give us the allocated add-on per line item

    I'm looking for a report that will list, in detail, each individual add-on allocated to each line item.
  • Votes

    2

    Password protect shared layouts

    We share layouts and when an individual makes a change to the layout it changes to the main layout. If it is protected then it forces a shared user to create their own ...
  • Votes

    1

    Allow us to turn off labor and equipment hour phase totals on reports

    If a report has equipment of labor, each phase has a total hours on reports. This is useless. Please allow us to turn it off.
  • Votes

    2

    Assembly Window, bottom item panel to many columns - (Hensel Phelps)

    When looking at the assembly window the bottom item panel there are so many columns. Could we please get the ability to control/hide these columns and it sticks on your ...
  • Votes

    2

    Labor Productivity Work Hours(WH) WH/Unit vs Unit/WH (Hensel Phelps)

    You can only setup items with one of these methods. Why cant another column be inserted that does the inverse for your? 0.008 WH/SF vs 125 SF/WH or 5 WH/TON vs 0.2 ...
  • Votes

    4

    Base Productivity & Productivity Factors

    Adjusting the "Labor Productivity Factor" changes the "Labor Productivity", and the "Labor Base Productivity" remains unchanged as it should. However, when you adjust the ...
  • Votes

    2

    Duplicate WBS code with values

    Let's say we have a WBS code capturing a buyout package assignment ID. But then things get shuffled around for how things are getting bought out. It would be nice to be ...
  • Votes

    2

    A WBS Report listing all 40 User Codes and their Direct Cost will be ...

    Sorting an Estimate by user defined WBS codes, and just having that codes Direct Cost will be helpful
  • Votes

    2

    It would be helpful to have a second notes area in item details ...

    We currently enter historical productivity notes in the Notes box, then have to delete them once they've been added to the estimate. Maybe you have a better method ...
  • Votes

    3

    WBS codes – Data Types

    When setting up WBS codes need to be able to define a data type (Number, String, Date, Limit to List Value) for each WBS code. When use enters value that is not the ...
  • Votes

    3

    Substitute All

    Please change the substitute all feature. Basically, whenever you are in spreadsheet view/Takeoff order, if you incorrectly selected something in the assembly takeoff ...
  • Votes

    1

    Ability to insert a row

    Please add the ability to add a row anywhere in the spreadsheet. Right now it can only be added to the bottom of a Sub-Division.
  • Planned

    2

    In "Manage Estimates" you can edit the columns to add certain fields, ...

    Add save option for the column layout in the Manage Estimate Function
  • Planned

    1

    Display entire branch "path" of an estimate

    Maybe hovering over the estimate name tab the entire branch path could be displayed. Wanting to open up another estimate in the same branch location but don't always ...
  • Votes

    2

    Single Button - On/Off Toggle Switch for Assemblies

    Many jobs would be easier to complete if I could turn individual Assemblies ON and Off with a single switch. (The Select-Right Click-Adjust works but it is not very slick ...