• Votes

    2

    Sage Estimating to Sage Intacct Interface

    With Sage Intacct, there is a flag on each standard task that allows it to be marked as inactive. When pulling up the standard task list in Sage Estimating, however, all ...
  • Votes

    2

    Intacct Integration

    Need the ability, when importing an estimate to Sage Intacct Construction, to be able to break the estimate down into sub-projects, similar to phases inside of sage 100 ...
  • Votes

    4

    Assembly Guide and Attachments

    Current version 19.11 Need to revisit Assembly Attachments such as pictures, notes, hyperlinks to anywhere There was an assembly guide that generated htm pages about the ...
  • Votes

    3

    Database variable help notes and links

    Current version 19.11 Need to revisit assembly database variable help notes to include items such as pictures, assembly guide notes, hyperlinks to anywhere Maybe the ...
  • Not Planned

    6

    We continue to be looking for Estimating to allow multiuser access.

    I understand that Timberline had a bad experience in the past with multiuser access but it is time to restore this. we typically have 3 -4 estimators working on a project ...
  • Planned

    4

    Flip productivity units on spreadsheet hr/unit --> unit/hr

    Right now the only way to "flip" productivity units on the spreadsheet is to open the items details window on the line item, then right click over the "/" slash where ...
  • Votes

    15

    Spell Check in Sage?? (Hensel Phelps)

    Owners lose Trust when they see spelling errors in an estimate which leads to them searching for other issues due to the Trust factor. I think its 2020 right, can't ...
  • Votes

    2

    Update WBS (Item Takoff Settings) per where you click on the ...

    When you click on an item within the spreadsheet, have the WBS update in the Item Takeoff Settings window. This will allow editing and adding items in the correct WBS ...
  • Votes

    5

    Calculate Labor Productivity in Overline

    In 18.11 If I manually fill the total Takeoff Quantity in the Overline, The program will calculate the Material Cost/Unit in the Overline. I would like to calculate the ...
  • Votes

    4

    View two totals pages side-by-side

    In Timberline Pervasive, you could view two Totals pages side-by side. In Sage SQL Estimating you can only view one at a time. Please put the feature in the SQL version.
  • Votes

    1

    Management Console Feature

    In Management Console, on the Estimates tab, estimates from the selected branch can be sorted and filtered. What would improve a notable weak spot with Sage (Estimate ...
  • Votes

    1

    Update Estimate WBS from Database

    This would work like Updating Database from Estimate, but all I need it are the WBS fields, where we have invested into some coding of WBS fields, we can then revise an ...
  • Votes

    2

    Column showing Base Rate from Wage Rate Table

    We would like to see a column in the spreadsheet to just show the Base Rate from the Wage Rate Table
  • Votes

    8

    Include a Dark Mode for the program

    We (estimators especially) spend 8-12 hours a day in front of our screens with programs that boast eye-blistering light because of the white default themes. in the age of ...
  • Votes

    8

    Vendor bid grid

    Create a vendor bid grid system. Replaces multiple material totals items with one supplier total quote.
  • Votes

    1

    Assign default WBS to items in assemblies

    It would be useful to be able to assign default WBS to items in an assembly in the database. Example use case: we could use a Usage WBS with options like footings, ...
  • Votes

    2

    WBS Code summary

    Similar to the Alternate Summary screen it would be extremely useful to see a WBS Code (single code sort) summary screen. WBS values and descriptions across the top and ...
  • Planned

    2

    Alternate summary descriptions

    So in the alternate summary you can hover over the alternate names to get the descriptions and that's as far as that information travels on that screen...you cannot use ...
  • Votes

    14

    Ability to import Labor Rate Tables from MS Excel

    Whenever I get updated Davis-Bacon rates I need to re-key the benefit values into my local rate table. Though it doesn't happen that often it's tedious. It would be ...
  • Votes

    1

    Put a pause on sorted column refresh

    Sometimes it is helpful to sort the spreadsheet on a column in order to fill blanks or update some value. But, the spreadsheet refreshes as soon as the value is changed, ...