Votes
2
Vendor / Subcontractor / Notes rating in address book
Add in a thumbs up/down/maybe on the address book along with notes. So when an estimator selects or enters the vendor or supplier the company ratings and notes pop up so ...by: Mike O. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Make JC Phase column available to estimating when the accounting side ...
Currently the accounting system resides on a separate server for security reasons. We have gone through the JC Phase's to make them shorter then the estimating phases as ...by: Mark K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Date / Time Update when entering same quantity
When working in a new version of an estimate, i.e. CD design, and a quantity didn't change, I would like the date / time to change wen the same quantity is entered. This ...by: Brian P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Abbreviate Item Descriptions
They used to have a feature in DOS that would automatically abbreviate the Item Descriptions as you reduced the column width, by deleting vowels starting near the end of ...by: Jason K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Move help note box location
Could you put the help notes for variables when in an assembly on the right side where it's out of the way? right now it hovers over/covers up each question in the ...by: Robert R. | 10 days ago | Last activity 10 days ago | Status changed 10 days ago | Other
-
Votes
1
Intacct Integration
Need the ability, when importing an estimate to Sage Intacct Construction, to be able to break the estimate down into sub-projects, similar to phases inside of sage 100 ...by: RYAN L. | 18 days ago | Last activity 18 days ago | Status changed 18 days ago | Other
-
Votes
1
Sequence by 'Group Assembly'
Would be great to get the option to sequence our spreadsheet by 'Group Assembly'. A group assembly is linked to every item so i dont see why we couldn't sequence by that. ...by: Samuel C. | 3 months ago | Last activity 3 months ago | Status changed 3 months ago | Other
-
Votes
1
Add 'Prefill' for Default WBS Values
When working on the spreadsheet, where the sequence shows multiple WBS columns, and when an existing item row is selected, add a 'Prefill' button to the Default Values ...by: Robert W. | 3 months ago | Last activity 3 months ago | Status changed 3 months ago | Other
-
Votes
1
Send over addons to Bid Matrix
Tried the sky bridge in Bid Matrix and the round trip works great bringing back in a project from Bid Matrix as a new Sage estimate. What doesn't work at all, however, ...by: Mike O. | 4 months ago | Last activity 4 months ago | Status changed 4 months ago | Other
-
Votes
1
Enhance Alternates Summary Screen experience
It would be cool if that Alternates Summary page look and feel could replace the traditional totals page. And just like reporting...be able to choose certain WBS sorts ...by: Mike O. | 4 months ago | Last activity 4 months ago | Status changed 4 months ago | Other
-
Votes
1
Multi-Tiered Assembly Grouping
It would be nice if we could create multi-tiered grouping for assemblies. Right now we can only have a main group and assemblies within this group. I find organizing my ...by: Samuel C. | 5 months ago | Last activity 5 months ago | Status changed 5 months ago | Other
-
Votes
1
Ability to Link Labor Productivity
It would be great to be able to link labor productivity. As an example, I have many different thicknesses of insulation, installed in different locations and have both ...by: Lance M. | about a year ago | Last activity about a year ago | Status changed about a year ago | Other
-
Votes
1
Correct the Variance report export to excel. subtotal lines are ...
when exporting variance reports to excel the subtotal lines are misaligned. The PDF version is fine.by: Mick H. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Please correct the Excel export from rate tables only some columns are ...
Since migrating to SQL we have found that only the first couple of benefit columns will export to excel. The export to pdf works fine. - we do have a table which has ...by: Mick H. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Planned
1
Deleting Addon Template Description Wrong
When trying to delete an addon, I get a message that the addon is used by a totals template. But the note gives the description of the addon. I believe it should give the ...by: Todd S. | over a year ago | Last activity over a year ago | Status changed about a year ago | Other
-
Votes
1
Editing Items in an Item Table
When you edit an item inside an item table, it opens the Edit Database Item window at the top of the list not at the item you selected to edit. Can this be corrected to ...by: Todd S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Assign sizes to multiple WBS Codes
For example, when working on an estimate for a project with multiple buildings, have the ability to assign a SF size to each building so that the estimate could calculate ...by: David W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
All Reports & Screens Need To Include Decimal Places
We estimate down to the penny and present our contracts with that level of detail included. The majority of the reports do not include the cents on the items and totals ...by: Gehman Design R. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
link labor and equipment production
It would be great to have the ability to link labor and equipment productivity.by: Chris P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Planned
1
Issue with version 21 transfer of estimate to job cost.
In prior version we could create custom JC cost codes on the estimate transfer while transferring estimating. In version 21 you have to go to job cost and create any new ...by: Kevin E. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other