Planned
1
Ability to apply a filter and combine items on a SS layout
Need the ability to apply a filter and combine items on a SS layout and subsequently a SS report. Right now you choose a filter and combine items turns off and vice ...by: Mike O. | 7 months ago | Last activity 7 months ago | Status changed 24 days ago | Other
-
Votes
3
Labor Productivity Work Hours(WH) WH/Unit vs Unit/WH (Hensel Phelps)
You can only setup items with one of these methods. Why cant another column be inserted that does the inverse for your? 0.008 WH/SF vs 125 SF/WH or 5 WH/TON vs 0.2 ...by: Kyle B. | over a year ago | Last activity 7 months ago | Status changed over a year ago | Other
-
Votes
3
Notes within the body of the estimate to help differentiate between ...
We have moved from an older estimating software that would allow us to make notes at the spreadsheet level and at the item or assembly entry level. This was extremely ...by: Bill M. | over a year ago | Last activity 7 months ago | Status changed over a year ago | Other
-
Votes
3
View two totals pages side-by-side
In Timberline Pervasive, you could view two Totals pages side-by side. In Sage SQL Estimating you can only view one at a time. Please put the feature in the SQL version.by: Todd S. | over a year ago | Last activity 7 months ago | Status changed over a year ago | Other
-
Votes
2
Ability to Link Labor Productivity
It would be great to be able to link labor productivity. As an example, I have many different thicknesses of insulation, installed in different locations and have both ...by: Lance M. | over a year ago | Last activity 7 months ago | Status changed over a year ago | Other
-
Votes
2
Multi-Tiered Assembly Grouping
It would be nice if we could create multi-tiered grouping for assemblies. Right now we can only have a main group and assemblies within this group. I find organizing my ...by: Samuel C. | about a year ago | Last activity 7 months ago | Status changed about a year ago | Other
-
Votes
2
Add 'Prefill' for Default WBS Values
When working on the spreadsheet, where the sequence shows multiple WBS columns, and when an existing item row is selected, add a 'Prefill' button to the Default Values ...by: Robert W. | about a year ago | Last activity 7 months ago | Status changed about a year ago | Other
-
Votes
2
Sequence by 'Group Assembly'
Would be great to get the option to sequence our spreadsheet by 'Group Assembly'. A group assembly is linked to every item so i dont see why we couldn't sequence by that. ...by: Samuel C. | about a year ago | Last activity 7 months ago | Status changed about a year ago | Other
-
Planned
3
Job Size Field - Allow Decimals
On the estimate information page, we need to be able to add decimal values in the Job Size field. We are a Transmission Service Provider that tracks TL projects by line ...by: Steve S. | 11 months ago | Last activity 7 months ago | Status changed 8 months ago | Other
-
Planned
2
Issue with version 21 transfer of estimate to job cost.
In prior version we could create custom JC cost codes on the estimate transfer while transferring estimating. In version 21 you have to go to job cost and create any new ...by: Kevin E. | over a year ago | Last activity 7 months ago | Status changed over a year ago | Other
-
Votes
3
Vendor / Subcontractor / Notes rating in address book
Add in a thumbs up/down/maybe on the address book along with notes. So when an estimator selects or enters the vendor or supplier the company ratings and notes pop up so ...by: Mike O. | over a year ago | Last activity 7 months ago | Status changed over a year ago | Other
-
Votes
1
Export to Excel with specific settings
This is best explained by the Sage Estimating General Discussion post here: ...by: Robert W. | 8 months ago | Last activity 8 months ago | Status changed 8 months ago | Other
-
Votes
1
Ability to create PO's in Sage Erp's from Sage Estimating
Expand the integration to the ERP's by making it possible to create PO's and subcontracts using Sage Estimating items, and have that exported to any of the three ERP's ( ...by: RYAN L. | 9 months ago | Last activity 9 months ago | Status changed 9 months ago | Other
-
Votes
1
Ability to create PO's in Sage ERP's from Sage Estimating
Expand the integration to the ERP's by making it possible to create PO's and subcontracts using Sage Estimating items, and have that exported to any of the three ERP's ( ...by: RYAN L. | 9 months ago | Last activity 9 months ago | Status changed 9 months ago | Other
-
Planned
9
Alternates - Base Bid should not change
There needs to be a way to have “Base Bid” items in an estimate when using alternates. When including or excluding alternates, the “Base Bid” value should not change. All ...by: Daniel D. | over a year ago | Last activity 9 months ago | Status changed over a year ago | Other
-
Votes
1
Intacct Integration
Need the ability, when importing an estimate to Sage Intacct Construction, to be able to break the estimate down into sub-projects, similar to phases inside of sage 100 ...by: RYAN L. | 10 months ago | Last activity 10 months ago | Status changed 10 months ago | Other
-
Planned
2
Display entire branch "path" of an estimate
Maybe hovering over the estimate name tab the entire branch path could be displayed. Wanting to open up another estimate in the same branch location but don't always ...by: Mike O. | over a year ago | Last activity 10 months ago | Status changed over a year ago | Other
-
Votes
2
Single Button - On/Off Toggle Switch for Assemblies
Many jobs would be easier to complete if I could turn individual Assemblies ON and Off with a single switch. (The Select-Right Click-Adjust works but it is not very slick ...by: Randy S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Planned
1
Deleting Addon Template Description Wrong
When trying to delete an addon, I get a message that the addon is used by a totals template. But the note gives the description of the addon. I believe it should give the ...by: Todd S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Please correct the Excel export from rate tables only some columns are ...
Since migrating to SQL we have found that only the first couple of benefit columns will export to excel. The export to pdf works fine. - we do have a table which has ...by: Mick H. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other