• Votes

    1

    link labor and equipment production

    It would be great to have the ability to link labor and equipment productivity.
  • Votes

    5

    Unlocking an estimate in use by others.

    Please enable the ability to make an estimate available by an Administrator when an estimate is in use by another user. This feature appears to have been disabled in the ...
  • Votes

    10

    Estimate Rounding

    There should be a button to click when viewing the entire estimate to round each material, other & equipment item # (or combination of the same item #s) to the nearest ...
  • Votes

    1

    Show the Rate % as a column in the Spreadsheet Layout

    It would be helpful if the Rate % shown in the Totals would be available as a column in the Spreadsheet Layouts. We would also like the Rates to be shown as an option in ...
  • Votes

    2

    Ability to Fill Down on multiple WBS columns

    We would like the ability to fill down on multiple cells across multiple columns similar to what Excel does.
  • Votes

    1

    Have a Way to Display WBS values entered on all Estimates in the ...

    This would create the ability to keep a historical log of all values entered for a particular WBS code.
  • Votes

    2

    Reference the Estimate

    I'd like to be able to code an assembly that can reference the already taken off estimate. In other words, I want to be able to write a formula that can search my ...
  • Votes

    6

    Add Item Window in Assemblies

    Please allow the add item window to remain open while editing formulas and while changing between assemblies. This was present on previous versions and I don't see why ...
  • Votes

    1

    Combine items in spreadsheet based solely on item descriptions

    Whenever I edit old estimates the items will not combine unless I re-price the estimate, or if item numbers or anything changed, I have to make an extra step to replace ...
  • Votes

    1

    Substitute

    The ability to substitute an item from the spreadsheet view. Anyone editing an estimate. It's time consuming to have to either go back to the assembly to do this, or to ...
  • Votes

    2

    Add Assembly from Assembly List

    The ability to add the assembly from the assembly list without having to open the assembly first. Who? Anyone who wants to save a step. Why? Time saving. How Used? ...
  • Votes

    1

    Send *unassigned* items to JC by themselves

    In order to send a portion of an estimate as a "Base Project" in Job Cost, the WBS code needs to be *unassigned* so it is not included in an Extra. This works great if ...
  • Votes

    5

    Add Productivity Tables as you had in Pervasive Program

    When you create a takeoff and are setting up job you are no longer in SQL Version offered the different Productivity Table List that had 10 different Productivity Levels ...
  • Votes

    7

    Include a Dark Mode for the program

    We (estimators especially) spend 8-12 hours a day in front of our screens with programs that boast eye-blistering light because of the white default themes. in the age of ...
  • Votes

    1

    Create a report that will give us the allocated add-on per line item

    I'm looking for a report that will list, in detail, each individual add-on allocated to each line item.
  • Votes

    2

    Password protect shared layouts

    We share layouts and when an individual makes a change to the layout it changes to the main layout. If it is protected then it forces a shared user to create their own ...
  • Votes

    1

    Allow us to turn off labor and equipment hour phase totals on reports

    If a report has equipment of labor, each phase has a total hours on reports. This is useless. Please allow us to turn it off.
  • Votes

    2

    Assembly Window, bottom item panel to many columns - (Hensel Phelps)

    When looking at the assembly window the bottom item panel there are so many columns. Could we please get the ability to control/hide these columns and it sticks on your ...
  • Votes

    2

    Labor Productivity Work Hours(WH) WH/Unit vs Unit/WH (Hensel Phelps)

    You can only setup items with one of these methods. Why cant another column be inserted that does the inverse for your? 0.008 WH/SF vs 125 SF/WH or 5 WH/TON vs 0.2 ...
  • Votes

    4

    Base Productivity & Productivity Factors

    Adjusting the "Labor Productivity Factor" changes the "Labor Productivity", and the "Labor Base Productivity" remains unchanged as it should. However, when you adjust the ...