    ReOrder Rule Maintinance "Rule" of Time with increments of Case for ...

    Update the Reorder Rules to allow it to plan in time rounded by case. Add a new rule to all the RO policy to look the demand need is a set time from the IRP to determine ...
  • Votes

    7

    closed/completed work ticket re-opening option

    sometimes a work ticket is closed inadvertently for a variety of reasons. It would be very helpful to be able to re-open a fully completed work ticket in production ...
  • Votes

    7

    PO default warehouse

    In Purchase Order Options, there is a default warehouse choice. It only limits you to 1 warehouse. I was wondering if you could have it default to the default warehouse ...
  • Votes

    7

    Auto generate option for job numbers

    It would be nice to have MAS90 be the point of creation of a job number from job costing module job maintenance. Even if it was optional for companies that don't see a ...
  • Not Planned

    7

    Add floor stock item type for bulk issue material

    Add item type to CI_Item, including floor stock for bulk issue material. Quantity on BOM should transact only cost, not inventory. MRP should project requirements by BOM ...
  • Votes

    7

    inventory cost

    We are a manufacturer and use Standard Costing for processing transactions. However, it would be very useful if could at the same time maintain cost tiers for FIFO, or ...
  • Votes

    7

    Un-receive inventory items when using FIFO

    In the purchase order, when having to un-receive items, it would be nice if we are able to choose which tier we want to un-receive. We are using FIFO, and it is creating ...
  • Votes

    7

    Physcial Count Variance Register - Separate update process from ...

    Currently this program does two things - 1. print/preview the variance report and 2. update the variances. I run several variance reports before updating. The two ...
  • Votes

    7

    Costed Bill of Materials Report. Cost Heading

    Put back the cost used heading on the report. Heading removed with 4.4 version. User doesn't know if they printed Last or Average Cost
  • Votes

    6

    Production Management Work Ticket Template - Increase Hours Decimal ...

    As a manufacture we need to have at least six decimal places in the hours field to accurately calculate the labor cost for each step. With only two decimal places the ...
  • Votes

    6

    Design Production Management Labor Entry like Timecard

    Timecard allows punch in/out to job numbers and a repunch. This feeds payroll and Job Cost. PM Labor Entry has a punch in/out function that does not allow entry of a ...
  • Votes

    6

    Prodcution Management - Work Ticket Dissassembly

    We are on Sage 100 2023 and using the PM module. We have started listing all materials within the WT Template instead of pulling them from a BOM. It would be helpful to ...
  • Votes

    6

    Run Reports Based on Year to Date or Multiple Year Usage for an ...

    It would be very helpful if we could run reports that would show year to date usage (sales, builds, etc.) for any given part # at any time. Better yet the option to see ...
  • Votes

    6

    Allow a standard scrap % to be set on an item.

    Allow a standard scrap % to be set on an item so that is is not overlooked in BOM. Like many, we cut extrusions to make products. We have a good idea of a standard ...
  • Not Planned

    6

    Allocate Serial #/Lot# during Work Order Entry

    For all the same reasons you want to preallocate serial numbers or lot numbers during sales order entry, you would also want to be able to preallocate serial numbers or ...
  • Votes

    6

    Router Maintenance

    We need to be able to track revision levels on routers. I know that this can be done on BOM's but we can't do it on the router maintenance. This would really help us ...
  • Votes

    6

    Add zero change Cycle Counts to IM5

    Retain zero change cycle count transactions in IM5 for inventory record accuracy measurement and reporting, and for last count date for scheduling based on ABC class. ...
  • Votes

    6

    W/O cost roll up register should reference a quantity when addressing ...

    If operations on a routing are of the LOT type and standard costing is being used, the W/O cost roll up register assumes a work order quantity of 1. This causes labor ...
  • Not Planned

    6

    Add a seasonal factor (by month) to MRP Calculations

    Most businesses are somewhat seasonal. We need the ability to set up our reorder points (minimum stocking levels) to be different for certain months of the year. In ...
  • Not Planned

    6

    Routing Maintenance: Move operations up / down, insert and delete, ...

    Routing Maintenance: Ability to move operations up / down, insert and delete, just like line items in Purchase Orders. Currently MAS200 does not allow for moving routing ...