• Not Planned

    6

    Routing Maintenance: Move operations up / down, insert and delete, ...

    Routing Maintenance: Ability to move operations up / down, insert and delete, just like line items in Purchase Orders. Currently MAS200 does not allow for moving routing ...
  • Not Planned

    2

    Expose Bill of Materials to Office365 connector API

    I would like the Bill of Materials module to be exposed to the Office365 connector API for PowerApps/Flow use. Specifically Bill of Materials Maintenance, Production ...
  • Not Planned

    13

    MRP should recognize both open sales orders and MTD sales when ...

    The projected demand for a month does not reflect MTD sales in MRP therefore as sales orders are filled the projected demand remains the same. The PD Itm Est line in the ...
  • Not Planned

    20

    MRP should recognize Bills with Options that are in Sales Order

    Currently, the documentation indicates that "MRP does not consider Bill Options when running the generation process. Bill Options are not supported". This results in ...
  • Not Planned

    5

    MRP should place component demand on component warehouse

    Demand that results from Sales Order and Sales Projections places the component demand on the parent warehouse. Many of our subassemblies are made in warehouse that ...
  • Not Planned

    4

    MRP and Maximum Stock Level

    Modification to MRP to use Maximum Stock Reorder Method when making reorder/make recommendations as it does on the Inventory Reorder Report. Currently MRP only recommends ...
  • Not Planned

    1

    Maximum workorder size

    I would like to see a maximum work order size in the WorkOrder module. For health and safety reasons we can only schedule a certain number of items per workorder and this ...
  • Not Planned

    4

    Item procurement method should be stored at the item warehouse level ...

    In reality, whether a specific item is Buy or Make or Subcontract depends on the warehouse (plant location). For example, item ABC123 is a make item for the 000 ...
  • Not Planned

    13

    In MRP, show standard and purchase UOM on action by vendor report

    In MRP, show standard and purchase UOM on action by vendor report
  • Not Planned

    14

    In MRP, give user ability to sort action by vendor report by top-level ...

    In MRP, give user ability to sort action by vendor report by top-level assembly, so that report shows all components needed for that assembly and all its subassemblies
  • Not Planned

    18

    Allow printing detailed MRP report by vendor then by item number.

    The current MRP report only allows printing by item number. The MRP action by vendor report does not provide the detail necessary to make actual decisions about item ...
  • Not Planned

    24

    Allow drilldown into MRP inquiry for any component when starting from ...

    Allow drilldown into MRP inquiry for any component when starting from top-level assembly
  • Not Planned

    7

    Add floor stock item type for bulk issue material

    Add item type to CI_Item, including floor stock for bulk issue material. Quantity on BOM should transact only cost, not inventory. MRP should project requirements by BOM ...
  • Not Planned

    6

    Add a seasonal factor (by month) to MRP Calculations

    Most businesses are somewhat seasonal. We need the ability to set up our reorder points (minimum stocking levels) to be different for certain months of the year. In ...
  • Not Planned

    5

    WO Zero Quantity Warning

    It would be helpful to display a warning if trying to complete a work order at quantity zero, similar to the one that is shown if you try to complete it for a quantity ...
  • Not Planned

    4

    WO module- Alert to notify or prevent completing qty more than planned

    In WO Transaction entry, there is nothing to prevent a user from completing a quantity greater than was qty planned on the WO. Should have an alert to at least let user ...
  • Not Planned

    4

    WO Entry screen should allow the Due date to be auto-filled by a ...

    WO entry screen due date gets auto-filled by the Promise date on the SO line item on make-for SO workorders. MAS should allow for that date field to be auto-filled by ...
  • Not Planned

    8

    WO- Complete to WO option should automatically issue the material to ...

    In WO transaction entry, the user is given the option to complete to either scrap, Inventory, SO or WO. Regardless of the choice, the completed parts post to inventory. ...
  • Not Planned

    10

    When creating a WO for a SO pull the warehouse code over

    Currently when you create a Work Order made for a Sales Order it does not pull over the warehouse for the line item. So the person creating the work order has to go pull ...
  • Not Planned

    11

    w/o component where-used inquiry should show Item and Revision

    In WO component where-used inquiry, the inquiry result should also show the Item number and Revision in addition to the WO#, step, and qty required.