• Votes

    4

    v7.4 All the explorer has copying and paste problems on date format ...

    These problems are happened after upgrade to V7.4: 1. Can not use Ctl-A and Ctl-C to make copying directly, only can use right click the mouse to make the selection from ...
  • Votes

    2

    Allow transactions with a quantity of zero to be entered on a progress ...

    There are certain times when a mistake is made in the manufacturing process, and a part has to be reworked. We would like to capture the labor costs of that rework, but ...
  • Votes

    1

    negative cost tier

    When an item has a negative quanitty on hand, the process cost tier adjustment should not require a negative number. It should be able to take a postive number and ...
  • Votes

    2

    Ability to view and enter data in screens in a spreadsheet format.

    Example is the purchase order line screen, where the bottom of the screen is a spreadsheet view but data entry or corrections can't be made in that area. A screen where ...
  • Votes

    1

    Vendor Performance Report

    The tolerance codes are only used to prevent or allow receiving depending on the setup of the code and whether an override is required. These tolerances are not used in ...
  • Votes

    3

    Add date for Labor Entry and Progress Entry reversal

    Labor Entry and Progress entry reversals are posted on the date that the reversal is made. We have had entries made accidently in future periods. Right now they can ...
  • Votes

    2

    Add More Options to the Cost Rollup Selection Screen

    Currently there are only three selection options. There is no way to exclude items that have an inactive status.
  • Votes

    5

    Add the ability to re-cost a BTO Kit

    Currently, there is no way to recalculate the cost of a BTO kit. This is important because of component cost changes that affect the total cost of the kit.
  • Votes

    2

    Standard Cost elements on Maintain Inventory screen - Cursor return

    Whenever an element of the standard cost is changed, the next time the screen is accessed for a different item, the cursor returns to the line below the element just ...
  • Votes

    11

    New Item Type "Component"

    Add an Item Type that specifies "Component" for parts that are not purchased raw material and not finished goods that you sell, but items you fabricate that go into ...
  • Votes

    3

    Production Return Transaction Posting Comment

    Need to add to the Production Return transaction a posting comment that should indicate that the transaction was a return so a company’s operations, inventory control and ...
  • Votes

    6

    MRP to rescheduling a purchase order with a push out action and pull ...

    It would be helpful to have push out and pull in actions for POs and other transactions. MRP can only create more orders when the best option might be to pull in a PO. ...
  • Votes

    5

    Allow misc items on a routing

    It would be very helpful to be able to have misc items on a routing. Rich DSG, Inc.
  • Votes

    10

    BOM Global Replace to include an option to replace the Mat Routing and ...

    When replacing a Material Item that has a "Mat Routing" and "Version" assigned (i.e., a subassembly), the "Mat Routing" and "Version" are removed during the BOM Global ...
  • Votes

    10

    Provide a warning if you are about to change the status of an item ...

    We should not be allowed to change an item from active status in Maintain Items if that item has an active routing or is used in an active routing.
  • Votes

    2

    Fix progress reversal for FIFO layering

    If there is an existing layer of a FIFO item and you progress a new layer and then reverse that entry the cost of the existing layer will be reversed instead of the cost ...
  • Votes

    2

    Allow update capability for 'Approve by Date' fields in MF Approvals ...

    The dates are initially assigned by calculating forward from the system date using the value of the 'Days to Approve' entries in 'Set Up Approval Types', at the time an ...
  • Votes

    4

    Delete multiple lines at once from work orders

    When we have a deviation to do to a work order routing, it would be helpful if we could select multiple lines at once for deletion vs. having to do it one at a time.
  • Votes

    2

    Planned WO should have the customer SHIP date as the due date not the ...

    Planned WO generated from MRP have a default finish date of the customers DOCK date! Planning and Scheduling would benefit greatly from the default finish date being the ...
  • Votes

    4

    Add "Change order" for Bill of Material changes

    Just like the Purchase Order module has a Change Order feature that allows you to track changes made to a PO, I would like to see a Routing/Bill of Material Change Order ...