-
Votes
4
Delete multiple lines at once from work orders
When we have a deviation to do to a work order routing, it would be helpful if we could select multiple lines at once for deletion vs. having to do it one at a time.by: Kate G. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
4
Scheduling does not have an employee constraint
We have more machines then employees. Currently, if 10 machines can run a part it will assume that all ten machines will be running. If, however, we only have 5 ...by: Joshua S. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
4
v7.4 All the explorer has copying and paste problems on date format ...
These problems are happened after upgrade to V7.4: 1. Can not use Ctl-A and Ctl-C to make copying directly, only can use right click the mouse to make the selection from ...by: chunyin W. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
4
Seperate Qty precision for manufacturing modules
Manufactures often use components at hich levels of decimal precision(s) .00235 units of a component but never purchase/sell items at 5 decimals. Customer should be ...by: James S. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
4
Multiple quotations
Necessary to relate/map multiple quotations to a Work Order since we have modifications and or improvements during the production process that need to be ...by: Arturo D. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
4
Enhance advanced manufacturing backflush to prompt for override of ...
Currently if material has been manually issued to a work order and the step marked as complete, the progress or labor step will re-issue the material to the work order ...by: Marty S. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
4
The ability to specify a particular step to trigger back flushing
Current functionality is that when a step is flagged for back flushing, the next labor step triggers the back flush. Our manufacturing department would like the ability ...by: Matt G. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
4
Enable Max Items for Physical Count
If we could specify a maximum count of items on a Physical Count we could much easier maintain our requirements for regular physical counts and make sure that we cover ...by: David P. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
4
Allow WOs to be grouped together for material issues.
We are a cut and sew operation that will nest a dozen or so WOs together for fabric utilization. I would like to be able to issue the total material used across all WOs ...by: Mike B. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
3
Production Return Transaction Posting Comment
Need to add to the Production Return transaction a posting comment that should indicate that the transaction was a return so a company’s operations, inventory control and ...by: Alec S. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
3
Add date for Labor Entry and Progress Entry reversal
Labor Entry and Progress entry reversals are posted on the date that the reversal is made. We have had entries made accidently in future periods. Right now they can ...by: Matthew A. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
3
All on the fly step entries or issues without item being on original ...
In standard MAS 90/200 you are able to issue materials/costs/labor etc. without the material/issue/labor every being on the original work order. In 500, the step first ...by: NANCY S. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
3
Break Time Codes by Department
Add the ability to set up break time codes by department in Manufacturing under Labor Set Up. Presently, there is no department selection abilility in the "Set Up Break ...by: Tom M. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
3
Shift premiums
Possibility of having more than just 3 logical shifts in order to link them to a group of employees within a shift with different attributes such as nightshift or ...by: Arturo D. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
3
Specify Labor Posting account at operation level or at least provide ...
Manufactures often track labor by the operation being performed. Currently these accounts are set at the mfg item class. So if it takes five operations to produce a ...by: James S. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
2
Planned WO should have the customer SHIP date as the due date not the ...
Planned WO generated from MRP have a default finish date of the customers DOCK date! Planning and Scheduling would benefit greatly from the default finish date being the ...by: Kim M. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
2
Allow update capability for 'Approve by Date' fields in MF Approvals ...
The dates are initially assigned by calculating forward from the system date using the value of the 'Days to Approve' entries in 'Set Up Approval Types', at the time an ...by: Dan S. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
2
Fix progress reversal for FIFO layering
If there is an existing layer of a FIFO item and you progress a new layer and then reverse that entry the cost of the existing layer will be reversed instead of the cost ...by: Matthew A. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
2
Ability to view and enter data in screens in a spreadsheet format.
Example is the purchase order line screen, where the bottom of the screen is a spreadsheet view but data entry or corrections can't be made in that area. A screen where ...by: Lori W. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing
-
Votes
2
Standard Cost elements on Maintain Inventory screen - Cursor return
Whenever an element of the standard cost is changed, the next time the screen is accessed for a different item, the cursor returns to the line below the element just ...by: Michael S. | over a year ago | Last activity over a year ago | Status changed over a year ago | 2 - Manufacturing