• Votes

    1

    Change Order Request - default grid for certain job info

    Certain jobs require different mark-up calculations. Having 40 or so current jobs, its hard to keep track of what the GC would like to see on the change order request. ...
  • Votes

    1

    Report Lines in Cost to Complete that have an Original Budget and ...

    When a Change Order is created that "zeroes out" a budget line, and there are no costs, that line no longer appears on the Cost to Complete screen (6-8-1.) Since this ...
  • Votes

    12

    Export Budget from Takeoff based on Bid Item Types

    Need the ability to export budget based on specific bid item types (1 - base bid, 2-allowances, 3-Alternate, 4-Changes). If a project manager forgot to export the ...
  • Votes

    3

    Menu item 6-4-1 (change order editing after save)

    Change orders should be return to being editable after being saved as it was in version 19. The only way to edit in the new version is to copy, delete, paste and then ...
  • Votes

    6

    Vendor list per project

    We just switched to Sage. We would like to produce a report for our field staff that lists each vendor (who we have entered in a PO or subcontract) PER PROJECT, with ...
  • Votes

    17

    3-5 Jobs (Client Pop Up)

    We need a pop up when creating a job that depends on the client. Some clients have special requirements, safety training, MSHA vs OSHA hours, etc. It would be awesome if ...
  • Votes

    1

    6-1-4-61 job profitability report

    In the 6-1-4-61 , by client/job, the report shows jobs that are in the current year. For example, running the report for Jan 2017 through Dec 2017, it would also include ...
  • Votes

    1

    We need to have the userdef field brought back as being able to change ...

    In version 19 we were able to select "Character" or "Number" as field types. In version 20, we are no longer able to select, therefore, reports created in version 19 no ...
  • Votes

    2

    create a building permit module under document control

    It would be nice to track DOB permits on Sage instead of a separate excel spreadsheet.
  • Votes

    3

    In the Purchase orders you cant copy, delete and paste in the created ...

    This was feature we had before the last update and it creates more work and steps the new way. It takes away from the flow your Po's used to have and leaves room for ...
  • Votes

    13

    Need to have a "County" field in 3-5 Jobs under the general tab.

    My state requires business licence filings by county and I really need the ability to run reports on projects based on location i.e. City of, and County of. Just the ...
  • Votes

    8

    Would like to have the ability to lock the added text within the Note ...

    When adding text to Notes, it would be really nice to automatically add Today's date instead of adding it manually. ALSO, very important for us, is to be able to lock ...
  • Votes

    1

    In 3-5 Job window we have certain groups that we want to see job ...

    In 3-5 Job window we have certain groups that should not see the contract amount and can be limited in that field. Only problem is that when clicking on the Contract ...
  • Votes

    6

    6-7-1 Subcontract. Add "Quantity" column to grid

    6-7-1 Subcontract. Add "Quantity" column to grid
  • Votes

    1

    6-7-1 Subcontract. Redesign 6-7-1-22 report so "Notes" header prints ...

    6-7-1 Subcontract. Redesign 6-7-1-22 report so "Notes" header prints above the printed grid notes.
  • Votes

    5

    submittal numbers "Next bj Job"

    Submittal numbering is critical to be able to number by Job, just like RFI's and Change Orders!
  • Votes

    6

    Report Scheduling - Committed Costs 6-1-12-21

    "File - Scheduling" is currently shaded out for this report, including 6-1-12-31, 6-1-12-41 This is a fundamental report for monitoring job status. Should be able to ...
  • Votes

    6

    The budget warnings to ignore the cost type & only look at job, phase ...

    upgrade to V20, the budget warning pop-up when creating a PO, warns on the cost type. We don't use the cost type for budget purpose only phase & costs code. Can it be ...
  • Votes

    10

    Daily Field Report Phase needs to be in grid so you can allocate a ...

    Please move the phase field to the grid inside of Daily Field Reports. We work on high-rises & our jobs can have up to a 100 phases. Would like 1 record per day that ...
  • Votes

    6

    6-6-1 Overwriting a record# with same PO#

    In v19.8 if I needed to change the vendor or other field from a saved PO, I was able to Copy and Paste the PO, make the necessary changes, and then type in manually the ...