    Change Order Budgets

    The budget tab on change order (6-4-1) should update the job budget to reflect the increase or decrease in budget when it is approved.

  • Votes

    47

    Allow for more than on phase to be on a Change Order

    Our company uses phases for each building that we build, and it is time consuming when we have to create 4 change orders to the owner just because we have to make changes ...

  • Votes

    45

    Bonding Report and Over/Under Report to pull information from the Cost ...

    Cost to Complete Report 6-8-1 doesn't go anywhere. It would be very helpful if the over/under billing report and the bonding report would pull from this report. On the ...

  • Votes

    43

    Lien Waiver Templates in Word

    We have found that the lien waivers are cumbersome to modify and design in Sage 100. Our old system (Maxwell Management Suite) used Word templates to create lien ...

  • Votes

    41

    Please Open 6-1-1-21 Job Status Report and 6-1-8-21 Bonding Report so ...

    It will cost our company thousands of dollars to have one field added to 6-1-1-21 (Job Status Report) and two Fields added to 6-1-8-21 (Bonding Report). These additions ...

  • Votes

    39

    Re-Allocate costs of payables/inv. allocs/cc receipts without voiding ...

    Often times job costs are allocated incorrectly. Usually to the wrong job. It is pretty time consuming to fix these errors. Since this is such a common occurrence, there ...

  • Votes

    35

    An option to track PO's by amount instead of quantity.

    I have found that more often than not in the construction industry, especially at the small to medium level, materials are not viewed as quantities. A supplier will ...

  • Votes

    32

    Job costing grid is overly complicated. Job Costing needs to be more ...

    The job costing grid should be eliminated. Job costing should be more closely tied to the General Ledger. There should simply be an extra field on each detail line of ...

  • Votes

    29

    Multiple jobs in one Purchase Order.

    Please allow to enter in multiple jobs within the grid on the purchase order.

  • Votes

    29

    Job Phase & Subcontract Records

    Subcontracts currently require Job Phase to be entered into the header of the record, forcing a different subcontract record for each phase of a job. It would be better ...

  • Votes

    26

    Budget Report to show Original Budget with Itemized Budget Changes

    Need a comprehensive Job Budget Report by Cost Code with following information on 1 page: 1. Original Budget 2. Itemized Budget Change Amounts with associated record ...

  • Votes

    25

    job budgets

    The 6-1-9 Budget Reports only include the original budget. As a contractor, we need to be able to have these reports include all of the Changes that have occurred since ...

  • Votes

    25

    Cost Code Record Line Limit too Low

    We would like the ability to add more than 5000 rows in 6-Project Management > 5-Cost Codes.

  • Votes

    23

    Change Orders to Update Budget - Prime Change Details automatically ...

    On the 6-4-1 Change Order when approved amounts, cost codes, and cost types are entered on the first tab, the data should automatically carry forward to the 2nd tab ...

  • Votes

    23

    I would like to be able to generate a contact list of Vendors per job. ...

    I would like to be able to generate a contact list of Vendors per job. This feature doesn't seem possible as I've contacted Sage 2 times and no one can figure it out.

  • Votes

    23

    Generate a WIP report with the option to show only current year ...

    I would like the report 6-1-7-21 with the option to only see current year information (a check box with exclude previous years) I have to generate a quarterly WIP report ...

  • Votes

    22

    It would be helpful when numbering projects to be able to enter ...

    When entering a job in (3-5) it would be helpful to be able to use . or - , or even alpha numeric. That way the job could be revised but still use the main part of the ...

  • Votes

    21

    Multiple Phases On Purchase Orders

    Phases needed to be added to the grid so you can have more than one phase per purchase order.

  • Votes

    21

    Change orders

    On the 3-5 screen when clicking the list of change orders, void or refused ones don't show HOWEVER it should still be there because it's still technically attached to the ...

  • Votes

    21

    Rename reports

    Allow user to rename reports to reflect business terminology