-
Votes
6
Allocate Serial #/Lot# during Work Order Entry
For all the same reasons you want to preallocate serial numbers or lot numbers during sales order entry, you would also want to be able to preallocate serial numbers or ...by: Mark L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Router Maintenance
We need to be able to track revision levels on routers. I know that this can be done on BOM's but we can't do it on the router maintenance. This would really help us ...by: Gary B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Add zero change Cycle Counts to IM5
Retain zero change cycle count transactions in IM5 for inventory record accuracy measurement and reporting, and for last count date for scheduling based on ABC class. ...by: Frank L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
W/O cost roll up register should reference a quantity when addressing ...
If operations on a routing are of the LOT type and standard costing is being used, the W/O cost roll up register assumes a work order quantity of 1. This causes labor ...by: Daniel W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Add a seasonal factor (by month) to MRP Calculations
Most businesses are somewhat seasonal. We need the ability to set up our reorder points (minimum stocking levels) to be different for certain months of the year. In ...by: JERRY L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Routing Maintenance: Move operations up / down, insert and delete, ...
Routing Maintenance: Ability to move operations up / down, insert and delete, just like line items in Purchase Orders. Currently MAS200 does not allow for moving routing ...by: Rob D. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Create a function which allows for an Administrative election to not ...
In order to accurately track On Time Delivery of suppliers, it would be beneficial to "Lock" the PO Due Date when the PO is created; add a field for "Revised PO Due Date" ...by: Mari W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Work Order uses Average Cost of Warehouse to calculate Standard ...
Clients like to measure the difference between the standard and actual cost of a work order. Since the standard "planned" cost uses the average cost which in my view ...by: Avron K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Change the Inventory Reorder report to give you an option to include ...
Change the Inventory Reorder report to give you an option to include issues, when you show usage. Currenlty only sales information shown. Great for a distributor, but ...by: Jim S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
6
Change DivisionNo back to string in SY0DCT for MRP forecast import
In MAS90/200 v4.4, the DivisionNo is now a ZEROFILLED field, whereas it used to be a string. When attempting to import, MAS90 auto creates Div 00 even if the entity does ...by: Kathleen M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Planned
5
Make Rev No Field Alphanumeric in Work Ticket Template
All of our CAD software was set-up to build revisions based on letter, not number, so we set up Bill of Materials accordingly in the old version of MAS90. With Work ...by: Michael F. | over a year ago | Last activity about a day ago | Status changed 22 days ago | Manufacturing
-
Votes
5
Show warehouse specific inventory quanitites on the work ticket
Having the ability to see inventory levels for the specified warehouse would eliminate back flushing inventory from the wrong warehouse.by: Michael C. | 4 months ago | Last activity 11 days ago | Status changed 4 months ago | Manufacturing
-
Votes
5
Design Production Management Labor Entry like Timecard
Timecard allows punch in/out to job numbers and a repunch. This feeds payroll and Job Cost. PM Labor Entry has a punch in/out function that does not allow entry of a ...by: Steve E. | over a year ago | Last activity about a month ago | Status changed over a year ago | Manufacturing
-
Votes
5
Item Audit Report To Record System induced changes
Item Audit Report does not record changes to unit cost if that cost is updated by using "Cost Roll-Up Register" for example. When tracking down price/cost changes it ...by: Bryan L. | over a year ago | Last activity about a month ago | Status changed over a year ago | Manufacturing
-
Votes
5
Allow steps in Phantom bills
WO (and now Production Management v2022) does not allow Step Numbers to be entered in Bill of Materials when the bill is a phantom. If you add a standard bill as a ...by: Robert W. | over a year ago | Last activity about a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Add the Percent Complete to the Work Ticket Steps
This was a standard column on Work Order that was not carried over to Production Management. It should have been. It enables users to quickly see where the Work Ticket ...by: Rosalie W. | over a year ago | Last activity about a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Current Desc for Bill of Material when looking it up
On our Bills of Material, we put the formula numbers in them. Currently, if you look up Bills of Material, the description it provides is from the 000 (first) revision, ...by: Ron C. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Production Management Work Ticket Totals tab should display Fixed and ...
Currently, Fixed and Variable Overhead are included in the total Labor, Material or Direct Cost. Detail is available on the Work Ticket Transaction Detail Report.by: Karen M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
MRP should place component demand on component warehouse
Demand that results from Sales Order and Sales Projections places the component demand on the parent warehouse. Many of our subassemblies are made in warehouse that ...by: Barry P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
5
Add totals of all warehouses to inventory inquiry screen, qty on hand, ...
In I/M inquiry I would like to see what the total qty on hand, PO, SO, etc is for all warehouses. Can we add a totals row to the bottom of the grid?by: Glen Z. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing