    Allow the usage/issue of materials in various UOMs.

    Currently the routing defaults material to the stocking UOM. The system should allow the user to dictate the UOM (Any valid UOM from the conversion list) the material ...
  • Votes

    13

    Improved tracking of Outside Processing (farm-out work).

    We have situations where we take components issued to a work order and send them out to a Vendor for machining/processing/testing. We accomplish this through the use of ...
  • Votes

    12

    Enable enforcement of processing sequence in work order steps

    The ability to enforce a sequential process is critical to some clients. An option should be allowed at the work order header and at the operation level to enforce ...
  • Votes

    12

    Allow work orders to be linked for reporting

    Create the ability to link work orders together and allow for reporting total actual material and labor transactions for all linked work orders. For example, companies ...
  • Votes

    11

    Allow one warehouse to carry standard cost for multiple warehouses

    Add ability to associate warehouses similar to the MRP Consolidate Warehouses screen. For example, this would indicate that warehouse A would be used in all costing ...
  • Votes

    11

    New Item Type "Component"

    Add an Item Type that specifies "Component" for parts that are not purchased raw material and not finished goods that you sell, but items you fabricate that go into ...
  • Votes

    10

    BOM Global Replace to include an option to replace the Mat Routing and ...

    When replacing a Material Item that has a "Mat Routing" and "Version" assigned (i.e., a subassembly), the "Mat Routing" and "Version" are removed during the BOM Global ...
  • Votes

    10

    Provide a warning if you are about to change the status of an item ...

    We should not be allowed to change an item from active status in Maintain Items if that item has an active routing or is used in an active routing.
  • Votes

    10

    In MRP, do not consider current period Projected Demand if Start Date ...

    On the 'Options' tab in MRP, a Start Date must be set to identify the beginning of the MRP plan you are creating/running. If this date is set to a date in a future ...
  • Votes

    10

    MRP / IR should be able to automatically set up PO's based on a ...

    We have ReDistribution business that orders in Truckload quantities. We would like IR / MRP to create PO's based on a standard order size (truckload). Each truckload ...
  • Votes

    10

    Scrap percentages at component level

    Need the ability to enter scrap percentage at the component level that affect only that component. Currently scrap % can only be set at the labor step and it is ...
  • Votes

    9

    The ability to allow Negative Inventory should be controlled at the ...

    There should still be a setting on the Set Up IM Options screen to determine whether a company will allow negative inventory in any warehouse, but there should also be a ...
  • Votes

    9

    Packing Slips for Mulitple Items

    There needs to be a way to combine all shipments on to one packing slip document. If multiple items are physically shipping out on one truck, multiple packing slips must ...
  • Votes

    8

    Provide a streamlined BOM regeneration process capable of updating the ...

    While material ID's can be readily added, changed or deleted in routing maintenance, that operation does nothing to update the bill of material. Clicking the BOM button ...
  • Votes

    8

    Physical inventory transaction

    Physical inventory transaction should be able to add back a serialized item that was physically counted out earlier.
  • Votes

    8

    Auto calculate required date when creating work orders

    The work order required date should be auto calculated based on lead time/window days on the router. It currently uses today's date.
  • Votes

    8

    Add scrap postings and scrap posting accounts

    When entering scrap quantities during a labor step there should be an option to generate scrap postings in the GL for these entries. The entry to scrap would be the ...
  • Votes

    7

    MRP should consider expiration date when planning orders for ...

    If on-hand quantity for an item has an expiration date, MRP should anticipate this and plan orders to be received in time to replace the expiring stock.
  • Votes

    7

    Scheduling cannot schedule multiple jobs on the same machine ...

    Some of our machines are setup to run multiple parts at one time. Each part will of course have its own work order and the employee is logged into each. So at the end ...
  • Votes

    7

    project accounting

    Have the ability to see comments entered in Purchase Orders with Projects to flow through to project accounting. Have the ability to view the Invoice and Purhcase Order ...