Votes
2
database Resource table needs at least two more text columns, Notes ...
add user-definable column, we need Makes and Models of equipment which will not FIT in description. add user-definable column, need second unique WBS which LINKS via ...by: Jon H. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
3
Database Rates table needs to include Notes column from Resource ...
In picking an equipment resource, user needs to SEE the data we put in one-by-one-by-thousands in the resource table. I.E. the equipment Model or pricing source. ...by: Jon H. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Report Totals Page - First or Last
Executive level clients like to see the Totals Page first, and then go into the estimate details as required. It would be helpful to have an option to print the totals ...by: Adrian C. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Toggle Botton On Spreadsheet Menu For Display Overline Values
Currently we have to go into File / Options to turn on / off Display Overline Totals When Expanded. To me this should be a button on the menu bar under Spreadsheet ...by: Mike O. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Assign sizes to multiple WBS Codes
For example, when working on an estimate for a project with multiple buildings, have the ability to assign a SF size to each building so that the estimate could calculate ...by: David W. | about a year ago | Last activity about a year ago | Status changed about a year ago | Other
-
Votes
1
Detail Type WBS Should Not Be In Item Takeoff Window
We need a WBS Type that can be edited in the Spreadsheet Layout without showing up as a column in the Item Takeoff window. Both Detail and Takeoff Type WBS's show up in ...by: Brett S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
4
Calculate Labor Productivity in Overline
In 18.11 If I manually fill the total Takeoff Quantity in the Overline, The program will calculate the Material Cost/Unit in the Overline. I would like to calculate the ...by: Dallas E. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Update WBS (Item Takoff Settings) per where you click on the ...
When you click on an item within the spreadsheet, have the WBS update in the Item Takeoff Settings window. This will allow editing and adding items in the correct WBS ...by: Dallas E. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
10
Unlocking the estimate that is in use by another user
Please enable the ability to make an estimate available by an Administrator when an estimate is in use by another user. this feature appears to have been disabled in the ...by: Greg P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
7
Please enable the ability to make an estimate available by an ...
In version 19 of Sage Estimating, the ability to access an estimate that was left open by another user was disabled. It is imperative this feature be reactivated. If an ...by: Jami E. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Automatically highlight or bold or flag cells that are changed from ...
Hi, I work on an in house design build team with multiple people/trades/disciplines using sage for project estimates. Our challenge with creating estimates using Sage ...by: Dave S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Importing Estimates - New Custom Cost Codes
I've been looking into the various 'import estimate' formats for .CSV files and while I've able to get the dollar amounts set-up as I'd like, I can't create new cost ...by: Nick Z. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
link labor and equipment production
It would be great to have the ability to link labor and equipment productivity.by: Chris P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Planned
1
Fix reporting when 'Automatically calculate overline quantities' ...
When the 'Automatically calculate overline quantities' setting is turned on, the quantities are not shown in the spreadsheet report. This causes us to have to manually ...by: Nathan M. | over a year ago | Last activity over a year ago | Status changed 4 months ago | Other
-
Votes
1
All Reports & Screens Need To Include Decimal Places
We estimate down to the penny and present our contracts with that level of detail included. The majority of the reports do not include the cents on the items and totals ...by: Gehman Design R. | about a year ago | Last activity about a year ago | Status changed about a year ago | Other
-
Votes
10
Estimate Rounding
There should be a button to click when viewing the entire estimate to round each material, other & equipment item # (or combination of the same item #s) to the nearest ...by: Sam M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Show the Rate % as a column in the Spreadsheet Layout
It would be helpful if the Rate % shown in the Totals would be available as a column in the Spreadsheet Layouts. We would also like the Rates to be shown as an option in ...by: Brett S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Ability to Fill Down on multiple WBS columns
We would like the ability to fill down on multiple cells across multiple columns similar to what Excel does.by: Brett S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Have a Way to Display WBS values entered on all Estimates in the ...
This would create the ability to keep a historical log of all values entered for a particular WBS code.by: Brett S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Reference the Estimate
I'd like to be able to code an assembly that can reference the already taken off estimate. In other words, I want to be able to write a formula that can search my ...by: Sam M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other