    Ability to create PO's in Sage ERP's from Sage Estimating

    Expand the integration to the ERP's by making it possible to create PO's and subcontracts using Sage Estimating items, and have that exported to any of the three ERP's ( ...
  • Votes

    1

    Ability to create PO's in Sage Erp's from Sage Estimating

    Expand the integration to the ERP's by making it possible to create PO's and subcontracts using Sage Estimating items, and have that exported to any of the three ERP's ( ...
  • Planned

    9

    Alternates - Base Bid should not change

    There needs to be a way to have “Base Bid” items in an estimate when using alternates. When including or excluding alternates, the “Base Bid” value should not change. All ...
  • Votes

    1

    Intacct Integration

    Need the ability, when importing an estimate to Sage Intacct Construction, to be able to break the estimate down into sub-projects, similar to phases inside of sage 100 ...
  • Planned

    2

    Display entire branch "path" of an estimate

    Maybe hovering over the estimate name tab the entire branch path could be displayed. Wanting to open up another estimate in the same branch location but don't always ...
  • Planned

    3

    Flip productivity units on spreadsheet hr/unit --> unit/hr

    Right now the only way to "flip" productivity units on the spreadsheet is to open the items details window on the line item, then right click over the "/" slash where ...
  • Votes

    11

    Drop Down Functionality

    Would be great to add drop down functionality to smart assemblies rather than only numeric input.
  • Votes

    2

    Date / Time Update when entering same quantity

    When working in a new version of an estimate, i.e. CD design, and a quantity didn't change, I would like the date / time to change wen the same quantity is entered. This ...
  • Votes

    17

    Bid Grid Notes Column (Ferguson Construction - Ohio)

    When in the "Bid Grid" window we would like for there to be a "Notes" column after the "Amount" column. Currently you have to right-click on the sub's name to add a note. ...
  • Votes

    3

    Milestones

    . Milestones in an estimate would be extremely beneficial as it would eliminate the need for creating/copying multiple estimate files and allow intra-estimate ...
  • Votes

    2

    Abbreviate Item Descriptions

    They used to have a feature in DOS that would automatically abbreviate the Item Descriptions as you reduced the column width, by deleting vowels starting near the end of ...
  • Votes

    2

    Make JC Phase column available to estimating when the accounting side ...

    Currently the accounting system resides on a separate server for security reasons. We have gone through the JC Phase's to make them shorter then the estimating phases as ...
  • Votes

    1

    Be able to create a new Available Elements to sort by

    Currently only able to use the given "Available Elements" to be able to sort your estimate. Would like to be able to create more Available Elements to be able to sort and ...
  • Votes

    9

    Scheduling Integration

    Integration into Primavera or Microsoft Project was a necessary component of the Pervasive Version that cut down hours of manual entry that SQL will now require.
  • Planned

    5

    Locking Location Values

    In Pervasive, I was able to select or set a location in the Default takeoff values and select ok. That location would be locked for all future item or assembly takeoffs ...
  • Votes

    3

    Enlarge the text in the takeoff window

    Would like to see the ability to enlarge the text in the takeoff window. You can currently zoom in on the spreadsheet view. The text in the takeoff window is so small ...
  • Votes

    4

    Report Writing

    Built-in report writing is very limited with the options Sage offers. At the very least we'd like to see the ability to export directly to Microsoft Word. Would also ...
  • Votes

    3

    Add additional security "Features"

    Add additional security "Features" in Management Console to create more granular security. Also, change estimate security only works for the estimate you create.
  • Votes

    5

    Why does the takeoff window have to be closed to access layout or ...

    If the "Assembly Takeoff" window is open, the following icons "gray" out: Info, Layout, Combine, Adjust Column, Move/Copy, Sort Sequence. You have to close the ...
  • Votes

    5

    Default Estimator