Votes
2
Report Totals Page - First or Last
Executive level clients like to see the Totals Page first, and then go into the estimate details as required. It would be helpful to have an option to print the totals ...by: Adrian C. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Toggle Botton On Spreadsheet Menu For Display Overline Values
Currently we have to go into File / Options to turn on / off Display Overline Totals When Expanded. To me this should be a button on the menu bar under Spreadsheet ...by: Mike O. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Planned
2
See WBS Value AND Description when assigning at item and assembly ...
Right now at item and assembly takeoff you can only see WBS values columns and not the associated Descriptions picking from the drop down selection. So for instance on a ...by: Mike O. | over a year ago | Last activity about a year ago | Status changed over a year ago | Other
-
Votes
2
Automatically highlight or bold or flag cells that are changed from ...
Hi, I work on an in house design build team with multiple people/trades/disciplines using sage for project estimates. Our challenge with creating estimates using Sage ...by: Dave S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Importing Estimates - New Custom Cost Codes
I've been looking into the various 'import estimate' formats for .CSV files and while I've able to get the dollar amounts set-up as I'd like, I can't create new cost ...by: Nick Z. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
link labor and equipment production
It would be great to have the ability to link labor and equipment productivity.by: Chris P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
4
Base Productivity & Productivity Factors
Adjusting the "Labor Productivity Factor" changes the "Labor Productivity", and the "Labor Base Productivity" remains unchanged as it should. However, when you adjust the ...by: Nick B. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Duplicate WBS code with values
Let's say we have a WBS code capturing a buyout package assignment ID. But then things get shuffled around for how things are getting bought out. It would be nice to be ...by: Traci W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
A WBS Report listing all 40 User Codes and their Direct Cost will be ...
Sorting an Estimate by user defined WBS codes, and just having that codes Direct Cost will be helpfulby: Frank R. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
It would be helpful to have a second notes area in item details ...
We currently enter historical productivity notes in the Notes box, then have to delete them once they've been added to the estimate. Maybe you have a better method ...by: Christiane K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
3
WBS codes – Data Types
When setting up WBS codes need to be able to define a data type (Number, String, Date, Limit to List Value) for each WBS code. When use enters value that is not the ...by: Kevin E. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
3
Substitute All
Please change the substitute all feature. Basically, whenever you are in spreadsheet view/Takeoff order, if you incorrectly selected something in the assembly takeoff ...by: Tristan W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Ability to insert a row
Please add the ability to add a row anywhere in the spreadsheet. Right now it can only be added to the bottom of a Sub-Division.by: Joe M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Assign sizes to multiple WBS Codes
For example, when working on an estimate for a project with multiple buildings, have the ability to assign a SF size to each building so that the estimate could calculate ...by: David W. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
All Reports & Screens Need To Include Decimal Places
We estimate down to the penny and present our contracts with that level of detail included. The majority of the reports do not include the cents on the items and totals ...by: Gehman Design R. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Single Button - On/Off Toggle Switch for Assemblies
Many jobs would be easier to complete if I could turn individual Assemblies ON and Off with a single switch. (The Select-Right Click-Adjust works but it is not very slick ...by: Randy S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Planned
1
Deleting Addon Template Description Wrong
When trying to delete an addon, I get a message that the addon is used by a totals template. But the note gives the description of the addon. I believe it should give the ...by: Todd S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Please correct the Excel export from rate tables only some columns are ...
Since migrating to SQL we have found that only the first couple of benefit columns will export to excel. The export to pdf works fine. - we do have a table which has ...by: Mick H. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Correct the Variance report export to excel. subtotal lines are ...
when exporting variance reports to excel the subtotal lines are misaligned. The PDF version is fine.by: Mick H. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Who /when assigns security to see/access estimates under any ...
So even a Jr estimator gets to assign security to new estimates? Might need to review: Who /when assigns security to see/access estimates under any particular branch? In ...by: Mike O. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other