Not Planned
14
Work Order Releases - select multiple work orders to release
Provide a selection screen for Work Order transaction entry - release transactions, similar to the AP check selection screen, where you can select all or use Shift-Click ...by: Steve P. | over a year ago | Last activity about a year ago | Status changed 2 months ago | Manufacturing
-
Votes
14
Inventory Count Card - Reconcilation to Inventory Items
The New Count Card Program is GREAT, EXCEPT: When using the Count Card system - - - - One audit should be done to close up the chance for error or items missed. There ...by: Joan G. | over a year ago | Last activity about a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
14
Expand the time in Work Order Routing from 2 decimals to 3 or 4 ...
Expand the time in Work Order Routing from 2 decimals to 3 or 4 decimals, this greatly affects manufacturing labor costs.by: Theresa M. | over a year ago | Last activity over a year ago | Status changed 2 months ago | Manufacturing
-
Not Planned
14
In MRP, give user ability to sort action by vendor report by top-level ...
In MRP, give user ability to sort action by vendor report by top-level assembly, so that report shows all components needed for that assembly and all its subassembliesby: Larry E. | over a year ago | Last activity over a year ago | Status changed 2 months ago | Manufacturing
-
Votes
13
production management ability to reverse a completion transaction
Sometimes a completion is entered wrong due to a UOM issue. We need the ability to reverse a completion or conduct a negative completion.by: Mike M. | about a year ago | Last activity 3 months ago | Status changed about a year ago | Manufacturing
-
Votes
13
Recalculate Item History by ITEM
Add additional logic to the Recalculate Item History to be able to choose an item to recalculate, rather than doing it all.by: Mary M. | over a year ago | Last activity 7 months ago | Status changed over a year ago | Manufacturing
-
Not Planned
13
removing material from work orders
Allow for materials that were issued to a work order be removed and not affect the cost of work order. Being able to un-do the material issued that is/was not required ...by: Anne S. | over a year ago | Last activity about a year ago | Status changed 2 months ago | Manufacturing
-
Votes
13
Improve "Integer Units of Measure" Feature in BOM
Provide rounding options (Always Up, Always Down, or Closest Integer) instead of always going to closest integer. The manufacturing process can sometimes utilize items ...by: Jeff L. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
13
MRP should recognize both open sales orders and MTD sales when ...
The projected demand for a month does not reflect MTD sales in MRP therefore as sales orders are filled the projected demand remains the same. The PD Itm Est line in the ...by: Howard C. | over a year ago | Last activity over a year ago | Status changed 2 months ago | Manufacturing
-
Votes
13
Prevent empty Bill of Materials from being created.
In version 4.40, if a bill contains a subassembly and that subassembly does not have components, the "explode subassembly" in production entry does not work. It also ...by: Moira G. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
13
Change the Inventory Reorder Report to show the "Last Receipt Date" ...
Currently, if an item has a Last Receipt Date but a Last Cost of .00 the date does not show. Here is a quote from a client. We inventory hundreds items in inventory at ...by: Kevin H. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Not Planned
13
In MRP, show standard and purchase UOM on action by vendor report
In MRP, show standard and purchase UOM on action by vendor reportby: Larry E. | over a year ago | Last activity over a year ago | Status changed 2 months ago | Manufacturing
-
Votes
12
IRP Option Switch Plan inside lead time Yes ro No
Add a check box option in the IRP Options to allow or disallow planning supply inside procurement or manufacturing lead time, today we are generating actions that cannot ...by: Kevin D. | 3 months ago | Last activity about a month ago | Status changed 3 months ago | Manufacturing
-
Votes
12
Add an Administrative Option to set system to not be able to ...
Currently, only a warning pop up is used to prevent an employee from issuing or shipping more inventory items than are currently on hand. If the employee clicks, "ok", ...by: Mari W. | over a year ago | Last activity 3 months ago | Status changed over a year ago | Manufacturing
-
Votes
12
Add ability to enter multiple production entries on the same screen.
To improve efficiency of data entry, add ability to enter multiple production entries on the same screen.by: Larry E. | over a year ago | Last activity 7 months ago | Status changed over a year ago | Manufacturing
-
Votes
12
Item Memo to show up during receipt of goods
We have several items where something needs to be done before they can go into general inventory. Some items need to be verified by engineering, some items must be pre ...by: Joe Z. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
12
Allow a Phantom Bill to be a component of another Phantom Bill
Provides much more flexibility in manufacturing. Some subassemblies are stocked subassemblies while others are non-stocked subassemblies. In the BOM and WO modules you ...by: Steve P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
12
Change the backorder status of PO to Incomplete
Much confusion arises between a PO status of back order versus a backorder quantity on PO. A PO can have a backorder status if a receipt of goods but no invoice has been ...by: Barbara K. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
12
Show the routing number in Bill of Materials Inquiry Screen
Currently to view which routing number is on the BOM, you have to go into Bill of Materials Maintenance. It would be easier to not have to go into maintenance for the ...by: Monica S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing
-
Votes
12
BOM- allow user to specify warehouse for components at BOM line item ...
BOM Maintenance should allow the user to specify a warehouse for each line item component. Currently we can only do that once the BOM Rev has been pulled into a WO.by: Geri R. | over a year ago | Last activity over a year ago | Status changed over a year ago | Manufacturing