• Votes

    3

    Cycle Count: Support for count tags and tag entry

    The current count sheet logic doesn't work well for performing annual physical counts. The process needs an option for declaring a physical count so the generation will ...
  • Votes

    6

    Cycle Count: Support for annual physical counts

    Sage ERP X3 support cycle counts but the process doesn't easily lend itself to performing annual physicals. It is not easy to get everything on a count without ...
  • Votes

    5

    Customer Specific Product - Private Labeling

    Would like a better way to manage customer specific products under a generic product ID. For example, they have a common hand soap that is private labeled for multiple ...
  • Votes

    4

    ADC: Support for non-terminal devices

    The ability to run ADC transaction on non-terminal devices is desired. Today, you have two choices. 1) Terminal based (ASCII) interface 2) Sage ERP X3 GUI/Web client ...
  • Votes

    12

    Forecasting capabilities without ISV

    Today Sage ERP X3 provides the ability to enter a forecast or use some perform basic allocations of an annual quantity. Additional functionality is needed to perform ...
  • Votes

    6

    Available to Promise: Improved visibility to customer support

    The current ATP logic is not sufficient to provide good meaningful information to customer service when processing an order. The current ATP is in the form of a quantity ...
  • Votes

    8

    Scheduling: Concept of sequencing not considered

    There are many industries that must do their scheduling in a particular sequence to minimize equipment clean ups and to avoid product contamination. This concept is not ...
  • Votes

    6

    Scheduling: Consideration of allergen constraints in sequencing

    In the food industry allergens can have a significant impact on how you manage and schedule your production facility. This is especially important is scheduling ...
  • Votes

    8

    KANBAN Replenishment

    Additional fields (number of containers, quantity per container, etc.) are required to support KANABAN processing. Additionally, a replenishment function that took these ...
  • Votes

    3

    Product: Flexible management of the status controls

    The controls that are associated with the product status are very powerful. What would really increase the flexibility would be to make the product statuses user ...
  • Votes

    11

    Product Controls at the Site Level

    A request was made to allow for the definition of many of the product controls at the site level. Some examples would be status, BOM Code, stocking UOM. etc. Idea ...
  • Votes

    6

    Sales Commissions: Product based Sales Rep Control

    In some sales organizations it is not uncommon to have sales representatives with specialized knowledge (ex: technical expertise). What that is the case, they are ...
  • Votes

    11

    Product Supercession/Phase Out based on Stock Availability

    Ability to switch to alternate materials based on stock availability. They don't want to change until they consume/use all of the existing product so a date trigger is ...
  • Votes

    2

    Setup entry/Transaction Management - Full control of UI

    Have full access to all non-mandatory/defaulted fields during the configuration of screen entry transactions. This should be extended so that it also includes arrays ...
  • Votes

    4

    Technical Sheets: Mass Validation Option

    Technical sheets share the same questions and responses but are validated individually. If you change a shared elements (like a default response) you should be able to ...
  • Votes

    2

    Technical Sheets: Response Copy Option

    When you have multiple work orders associated with the same batch (ex: pack out of bulk material), it would be very helpful if you could copy the technical sheet ...
  • Votes

    3

    Product Data: Ability to define a "potential supplier" to a product

    When working on sourcing of new products/raw materials, they often know they need a product but have not determined the supplier. In those cases, they would like to be ...
  • Votes

    4

    Complementary Invoices: Extend concept to shipping

    The current complementary invoice process is used for processing additional charges on products that you have received. The same capability is needed to assess ...
  • Votes

    3

    Complementary Invoices: Better invoice selection

    It is difficult to process complementary invoices because the invoices do not disappear from the selection window once they are used. It would be easier to process if ...
  • Votes

    2

    Production Tracking: Ability to view work instructions from within ...

    Ability to view routing or work instructions from within the tracking function is needed. Currently, the user has to open another or secondary session to view. Idea ...