Votes
1
Detail Type WBS Should Not Be In Item Takeoff Window
We need a WBS Type that can be edited in the Spreadsheet Layout without showing up as a column in the Item Takeoff window. Both Detail and Takeoff Type WBS's show up in ...by: Brett S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Add 'Prefill' for Default WBS Values
When working on the spreadsheet, where the sequence shows multiple WBS columns, and when an existing item row is selected, add a 'Prefill' button to the Default Values ...by: Robert W. | over a year ago | Last activity about a year ago | Status changed over a year ago | Other
-
Votes
2
Sequence by 'Group Assembly'
Would be great to get the option to sequence our spreadsheet by 'Group Assembly'. A group assembly is linked to every item so i dont see why we couldn't sequence by that. ...by: Samuel C. | over a year ago | Last activity about a year ago | Status changed over a year ago | Other
-
Votes
2
Ability to Link Labor Productivity
It would be great to be able to link labor productivity. As an example, I have many different thicknesses of insulation, installed in different locations and have both ...by: Lance M. | over a year ago | Last activity about a year ago | Status changed over a year ago | Other
-
Votes
3
Import one time items
I would be a HUGE time saver if we could import (Excel) multiple one time items to a phase.by: Scott W. | over a year ago | Last activity about a year ago | Status changed over a year ago | Other
-
Votes
2
Multi-Tiered Assembly Grouping
It would be nice if we could create multi-tiered grouping for assemblies. Right now we can only have a main group and assemblies within this group. I find organizing my ...by: Samuel C. | over a year ago | Last activity about a year ago | Status changed over a year ago | Other
-
Votes
1
Enhance Alternates Summary Screen experience
It would be cool if that Alternates Summary page look and feel could replace the traditional totals page. And just like reporting...be able to choose certain WBS sorts ...by: Mike O. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Planned
1
Send over addons to Bid Matrix
Tried the sky bridge in Bid Matrix and the round trip works great bringing back in a project from Bid Matrix as a new Sage estimate. What doesn't work at all, however, ...by: Mike O. | over a year ago | Last activity over a year ago | Status changed about a year ago | Other
-
Votes
11
Unlocking the estimate that is in use by another user
Please enable the ability to make an estimate available by an Administrator when an estimate is in use by another user. this feature appears to have been disabled in the ...by: Greg P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
8
Please enable the ability to make an estimate available by an ...
In version 19 of Sage Estimating, the ability to access an estimate that was left open by another user was disabled. It is imperative this feature be reactivated. If an ...by: Jami E. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
5
Unlocking an estimate in use by others.
Please enable the ability to make an estimate available by an Administrator when an estimate is in use by another user. This feature appears to have been disabled in the ...by: Zach C. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
10
Estimate Rounding
There should be a button to click when viewing the entire estimate to round each material, other & equipment item # (or combination of the same item #s) to the nearest ...by: Sam M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Show the Rate % as a column in the Spreadsheet Layout
It would be helpful if the Rate % shown in the Totals would be available as a column in the Spreadsheet Layouts. We would also like the Rates to be shown as an option in ...by: Brett S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Ability to Fill Down on multiple WBS columns
We would like the ability to fill down on multiple cells across multiple columns similar to what Excel does.by: Brett S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Have a Way to Display WBS values entered on all Estimates in the ...
This would create the ability to keep a historical log of all values entered for a particular WBS code.by: Brett S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Reference the Estimate
I'd like to be able to code an assembly that can reference the already taken off estimate. In other words, I want to be able to write a formula that can search my ...by: Sam M. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
6
Add Item Window in Assemblies
Please allow the add item window to remain open while editing formulas and while changing between assemblies. This was present on previous versions and I don't see why ...by: Kenneth S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Combine items in spreadsheet based solely on item descriptions
Whenever I edit old estimates the items will not combine unless I re-price the estimate, or if item numbers or anything changed, I have to make an extra step to replace ...by: Kenneth S. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
1
Substitute
The ability to substitute an item from the spreadsheet view. Anyone editing an estimate. It's time consuming to have to either go back to the assembly to do this, or to ...by: Ramon P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other
-
Votes
2
Add Assembly from Assembly List
The ability to add the assembly from the assembly list without having to open the assembly first. Who? Anyone who wants to save a step. Why? Time saving. How Used? ...by: Ramon P. | over a year ago | Last activity over a year ago | Status changed over a year ago | Other