• Votes

    3

    Increase price limit of a part

    We need to enter parts with a cost and billing amount exceeding $99,999.99 but anything greater than this creates an error of "Invalid numeric entry." This should not be ...
  • Votes

    3

    Enter a check box on 3-5 screen for whether to allow the previous ...

    I would like to open my takeoff launch in 9-5 and only see takeoffs that I want to see... now I have a very large list and only need access to 4 or 5. It would be great ...
  • Votes

    3

    I'd like to use decimal formatting for part numbers in the same ...

    The part number would consist of the part class to the left of the decimal and the part # to the right. I envision a max of 5 decimal places to right and 7 to the left.
  • Votes

    1

    Labor Hours Associated to Material Units.

    There are many other estimating programs that offer labor hours for each item in their database. Begin using standard labor-units (Craft Hours) in your material database.
  • Votes

    6

    Easier Material Price Updates

    Begin using an outside service with the ability to import product and pricing information to update and maintain accuracy in our material database & estimating system; ...
  • Votes

    5

    Exporting Subcontracts - better control

    When exporting subcontracts from a takeoff, allow us better control over what we're exporting, like an option to select by phase or a "deselect all" button.
  • Votes

    3

    Keep proposal exporting from overwriting the "notes" field

    Be able to export proposals in different phases without overwriting other phases. Since we deal in multiple phases, I get tired of having to cut and paste to keep from ...
  • Votes

    3

    Make navigation in takeoffs easier

    Need scroll arrows for phases & bid items to scroll sequentially instead of having to click down on the arrow and then clicking the phase or bid items.
  • Votes

    3

    Takeoff "recap" by phases

    Be able to summarize phases in more breakouts. We utilize multiple phases in all jobs and in the 9-5 takeoff "recap" tab, the only summary is by phase. There should be ...
  • Votes

    0

    Change take off item a different color so that you can input a plug ...

    In the estimating module they should be a way of making a take off item a different color so that you can input a plug number while waiting for a sub to turn in numbers
  • Votes

    4

    Most of our bids are set up by bid item. We want to be able to export ...

    Most public works or commercial bids are set up by bid item. Sage recognizes this as it possible to estimate by bid item. We want to be able to export our budget by bid ...
  • Votes

    18

    side by side comparison of two or more takeoffs, budgets, or proposals

    Be able to view and edit more than one takeoff, budget or proposal at once without having to print them. Alt. be able to create and save versions of a takeoff without ...
  • Votes

    2

    Increase the parts quantity in the assemblies from four decimal places ...

    Some of the production rates for our business can be quite large, so the hours rate divided by that production can lead to some small numbers for labor and equipment ...
  • Votes

    8

    Allow for assembly formulas to round for a whole number quantity

    I need to be able to make a formula that has a function to round the calculated quantity up to the next whole number. I find it hard to calculate something and I need a ...
  • Votes

    1

    9-3 Assemblies - New Button No Longer Allows For Entry of Assembly ...

    After clicking the new button from within the 9-3 Assemblies form the assembly number is changed to the next available new assembly number. I believe that previous ...
  • Votes

    1

    Checking for Locked Takeoffs/Takeoffs in Edit Mode is not Being ...

    After opening a takeoff the and using the new button to open a different takeoff the ptotkf.edtnme field is not checked again to see if the requested takeoff is ...
  • Votes

    4

    Fix the "Zero" (None) bid item

    The "Zero" (None) bid item should be fixed, so the associated costs can be allocated to the base bid items on a percentage basis in the exported proposal. When costs ...
  • Votes

    9

    Estimating Module-need a way to merge/combine 1 takeoff to another ...

    Estimating Module-need a way to merge/combine 1 takeoff to another takeoff; right now we have to export/import individual grids to combine. This is very labor intensive, ...
  • Votes

    3

    Add New Item Type to Bid Items

    When creating a takeoff, we oftentimes have line items that are crossed off but will be added back in again at a later time. Instead of deleting the grid and having to ...
  • Votes

    6

    Would like to update or add vendor part # (Order #) from the 9-6 or ...

    The ability to add vendors part # (order#) from a file. We have multiple lumber suppliers for the same part. Also, would like to have vendors part # show up on purchase ...